{
 "date": "2026-11-21",
 "schema": {
  "type": "H hyperscaler self-build | C colocation/wholesale | A AI campus/neocloud/AI lab | T telco/sovereign/other",
  "st": "O operating (incl. ramping) | U under construction | P planned/announced",
  "mw": "reported capacity in MW, null if undisclosed",
  "basis": "i = IT/critical load, g = grid/total power",
  "src": "[[url,label],...] only for checked sources",
  "checked": "date sources were last verified",
  "now_it": "optional: estimated IT MW energised today (e.g. Epoch AI satellite estimate); mw stays the full build-out figure"
 },
 "countries": {
  "US": {
   "name": "United States",
   "region": "North America"
  },
  "CA": {
   "name": "Canada",
   "region": "North America"
  },
  "BR": {
   "name": "Brazil",
   "region": "Latin America"
  },
  "MX": {
   "name": "Mexico",
   "region": "Latin America"
  },
  "CL": {
   "name": "Chile",
   "region": "Latin America"
  },
  "AR": {
   "name": "Argentina",
   "region": "Latin America"
  },
  "GB": {
   "name": "United Kingdom",
   "region": "Europe"
  },
  "IE": {
   "name": "Ireland",
   "region": "Europe"
  },
  "DE": {
   "name": "Germany",
   "region": "Europe"
  },
  "NL": {
   "name": "Netherlands",
   "region": "Europe"
  },
  "FR": {
   "name": "France",
   "region": "Europe"
  },
  "NO": {
   "name": "Norway",
   "region": "Europe"
  },
  "SE": {
   "name": "Sweden",
   "region": "Europe"
  },
  "DK": {
   "name": "Denmark",
   "region": "Europe"
  },
  "FI": {
   "name": "Finland",
   "region": "Europe"
  },
  "IS": {
   "name": "Iceland",
   "region": "Europe"
  },
  "PT": {
   "name": "Portugal",
   "region": "Europe"
  },
  "ES": {
   "name": "Spain",
   "region": "Europe"
  },
  "IT": {
   "name": "Italy",
   "region": "Europe"
  },
  "AE": {
   "name": "United Arab Emirates",
   "region": "Middle East & Africa"
  },
  "SA": {
   "name": "Saudi Arabia",
   "region": "Middle East & Africa"
  },
  "QA": {
   "name": "Qatar",
   "region": "Middle East & Africa"
  },
  "ZA": {
   "name": "South Africa",
   "region": "Middle East & Africa"
  },
  "NG": {
   "name": "Nigeria",
   "region": "Middle East & Africa"
  },
  "KE": {
   "name": "Kenya",
   "region": "Middle East & Africa"
  },
  "JP": {
   "name": "Japan",
   "region": "Asia Pacific"
  },
  "KR": {
   "name": "South Korea",
   "region": "Asia Pacific"
  },
  "TW": {
   "name": "Taiwan",
   "region": "Asia Pacific"
  },
  "CN": {
   "name": "China",
   "region": "Asia Pacific"
  },
  "HK": {
   "name": "Hong Kong",
   "region": "Asia Pacific"
  },
  "SG": {
   "name": "Singapore",
   "region": "Asia Pacific"
  },
  "MY": {
   "name": "Malaysia",
   "region": "Asia Pacific"
  },
  "ID": {
   "name": "Indonesia",
   "region": "Asia Pacific"
  },
  "TH": {
   "name": "Thailand",
   "region": "Asia Pacific"
  },
  "VN": {
   "name": "Vietnam",
   "region": "Asia Pacific"
  },
  "PH": {
   "name": "Philippines",
   "region": "Asia Pacific"
  },
  "IN": {
   "name": "India",
   "region": "Asia Pacific"
  },
  "AU": {
   "name": "Australia",
   "region": "Asia Pacific"
  },
  "NZ": {
   "name": "New Zealand",
   "region": "Asia Pacific"
  }
 },
 "changelog": [
  {
   "date": "2026-11-21",
   "summary": "US batch: 8 records filled or updated, 2 new AI campuses.",
   "changes": [
    "Google Pryor: Epoch est. 368 MW IT (TPU)",
    "CoreWeave Denton: ~260 MW critical IT, 262 MW live",
    "Applied Digital Polaris Forge 1 now ~250 MW operational; PF2 200 MW leased to a hyperscaler",
    "Switch Core Campus: 495 MW at build-out",
    "Lambda Kansas City: 24 MW initial → 100 MW+",
    "TeraWulf Lake Mariner: 102 MW delivered (Core42, Fluidstack/Anthropic)",
    "Added: Applied Digital Delta Forge 2 (210 MW), TeraWulf Kentucky campus (Anthropic lease)"
   ]
  },
  {
   "date": "2026-11-21",
   "summary": "Research pass: 30+ records verified or filled in; added live IT estimates for major AI campuses; 6 new facilities.",
   "changes": [
    "Added 'live now' IT estimates (Epoch AI) for 14 AI campuses, e.g. New Carlisle ~1,037 MW, Colossus 2 ~946 MW, Abilene ~824 MW",
    "Fairwater Wisconsin: 2,263 MW IT projected; Fairwater Atlanta: 636 MW IT",
    "Filled capacity: KDDI Sakai 48 MW, SoftBank Sakai 140 MW, MC Digital Realty NRT 104 MW, Colt Inzai 50 MW, QTS Cambois 720 MW, Microsoft Rhineland ~500 MW, Schwarz Lübbenau 200 MW",
    "Status: SK–AWS Ulsan target raised to 1 GW; DataVolt Oxagon under construction; AdaniConneX Taloja + CoreWeave 240 MW",
    "Fluidstack's 1 GW France project marked withdrawn (Mar 2026) and excluded from totals",
    "Added: Nebius Lappeenranta 310 MW, Humain East Riyadh 6 GW, NEXTDC S7 550 MW, Digital Reef 600 MW, Schwarz Rostock 240 MW, Mistral Borlänge"
   ]
  },
  {
   "date": "2026-11-21",
   "summary": "Initial release: 336 facilities in 39 countries; 55 records verified against sources.",
   "changes": []
  }
 ],
 "facilities": [
  {"name": "Stargate Abilene (Crusoe / Oracle)", "op": "OpenAI · Oracle · Crusoe", "cc": "US", "city": "Abilene, TX", "lat": 32.5, "lon": -99.78, "type": "A", "st": "O", "mw": 1200, "basis": "g", "ai": true, "note": "Flagship Stargate campus; Epoch est. ~824 MW IT live (Nov 2026), 1.2 GW grid planned", "src": [["https://epoch.ai/graphs/largest-ai-data-centers-by-power-capacity", "Epoch AI — Largest AI data centers by power (Nov 2026)"], ["https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand", "Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)"], ["https://openai.com/index/five-new-stargate-sites/", "OpenAI — Five new Stargate sites (Sep 2025)"]], "checked": "2026-11-21", "now_it": 824},
  {"name": "Stargate Shackelford County (Vantage Frontier)", "op": "OpenAI · Oracle · Vantage", "cc": "US", "city": "Shackelford County, TX", "lat": 32.73, "lon": -99.33, "type": "A", "st": "U", "mw": 1400, "basis": "g", "ai": true, "note": "Vantage Frontier campus, 1,200 acres; first building H2 2026", "src": [["https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand", "Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)"], ["https://www.datacenterfrontier.com/machine-learning/article/55319132/scaling-stargate-openais-five-new-us-data-centers-push-toward-10-gw-ai-infrastructure", "Data Center Frontier — Scaling Stargate"]], "checked": "2026-11-21"},
  {"name": "Stargate Doña Ana County", "op": "OpenAI · Oracle", "cc": "US", "city": "Doña Ana County, NM", "lat": 31.88, "lon": -106.7, "type": "A", "st": "U", "mw": 2200, "basis": "g", "ai": true, "note": "On-site gas; projected completion Q4 2028", "src": [["https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand", "Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)"]], "checked": "2026-11-21"},
  {"name": "Stargate Milam County (SB Energy)", "op": "OpenAI · SoftBank", "cc": "US", "city": "Milam County, TX", "lat": 30.79, "lon": -96.98, "type": "A", "st": "U", "mw": 1200, "basis": "g", "ai": true, "note": "SoftBank-owned hardware; projected Q4 2028", "src": [["https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand", "Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)"], ["https://openai.com/index/five-new-stargate-sites/", "OpenAI — Five new Stargate sites (Sep 2025)"]], "checked": "2026-11-21"},
  {"name": "Stargate Lordstown", "op": "OpenAI · SoftBank", "cc": "US", "city": "Lordstown, OH", "lat": 41.17, "lon": -80.86, "type": "A", "st": "U", "mw": null, "basis": "g", "ai": true, "note": "SoftBank site; part of 1.5 GW SoftBank/OpenAI tranche", "src": [["https://openai.com/index/five-new-stargate-sites/", "OpenAI — Five new Stargate sites (Sep 2025)"], ["https://www.techrepublic.com/article/news-stargate-five-data-centers/", "TechRepublic — Stargate five new sites"]], "checked": "2026-11-21"},
  {"name": "Stargate Port Washington (Vantage Lighthouse)", "op": "OpenAI · Oracle · Vantage", "cc": "US", "city": "Port Washington, WI", "lat": 43.39, "lon": -87.88, "type": "A", "st": "U", "mw": 1300, "basis": "g", "ai": true, "note": "Grid-powered; construction began Q1 2026", "src": [["https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand", "Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)"]], "checked": "2026-11-21"},
  {"name": "Stargate Saline Township", "op": "OpenAI · Oracle · Related Digital", "cc": "US", "city": "Saline Township, MI", "lat": 42.17, "lon": -83.78, "type": "A", "st": "U", "mw": 1400, "basis": "g", "ai": true, "note": "Grid-powered; projected Q4 2028", "src": [["https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand", "Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)"]], "checked": "2026-11-21"},
  {"name": "Colossus 1", "op": "SpaceXAI (xAI)", "cc": "US", "city": "Memphis, TN", "lat": 35.06, "lon": -90.15, "type": "A", "st": "O", "mw": 300, "basis": "g", "ai": true, "note": "Converted Electrolux plant; built in 122 days", "src": [["https://www.datacenterfrontier.com/machine-learning/article/55343403/xais-ai-factories-from-colossus-to-macrohardrr-in-the-gigawatt-era", "Data Center Frontier — xAI's AI factories"]], "checked": "2026-11-21"},
  {"name": "Colossus 2", "op": "SpaceXAI (xAI)", "cc": "US", "city": "Memphis, TN / Southaven, MS", "lat": 35.0, "lon": -89.98, "type": "A", "st": "O", "mw": 946, "basis": "i", "ai": true, "note": "~946 MW IT per S-1-based estimate; expansion toward ~2 GW", "src": [["https://epoch.ai/graphs/largest-ai-data-centers-by-power-capacity", "Epoch AI — Largest AI data centers by power (Nov 2026)"], ["https://epoch.ai/data/ai-data-centers/directory/colossus-2", "Epoch AI — Colossus 2"]], "checked": "2026-11-21", "now_it": 946},
  {"name": "Meta Prometheus", "op": "Meta", "cc": "US", "city": "New Albany, OH", "lat": 40.08, "lon": -82.78, "type": "H", "st": "O", "mw": 1000, "basis": "g", "ai": true, "note": "1 GW 'titan' cluster; Epoch est. 471 MW IT live, ~1,022 MW IT projected", "src": [["https://epoch.ai/data/ai-data-centers/directory/meta-prometheus", "Epoch AI — Meta Prometheus"], ["https://gamesbeat.com/how-meta-built-a-1gw-data-center-in-ohio-and-is-planning-for-a-5gw-data-center-in-louisiana/", "GamesBeat — How Meta built a 1 GW data center"]], "checked": "2026-11-21", "now_it": 471},
  {"name": "Meta Hyperion", "op": "Meta", "cc": "US", "city": "Richland Parish, LA", "lat": 32.36, "lon": -91.62, "type": "H", "st": "U", "mw": 2000, "basis": "g", "ai": true, "note": "2 GW by 2030, scaling to 5 GW; on-site gas plants", "src": [["https://epoch.ai/data/ai-data-centers/directory/meta-hyperion", "Epoch AI — Meta Hyperion (Sep 2026)"], ["https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center", "TechCrunch — Meta is building a 5 GW AI data center"]], "checked": "2026-11-21"},
  {"name": "Meta El Paso", "op": "Meta", "cc": "US", "city": "El Paso, TX", "lat": 31.82, "lon": -106.36, "type": "H", "st": "U", "mw": 1000, "basis": "g", "ai": true, "note": "1 GW AI campus", "src": [["https://thenextweb.com/news/meta-200-billion-hyperion-data-center-louisiana", "The Next Web — Meta Hyperion / El Paso"]], "checked": "2026-11-21"},
  {"name": "Meta Lebanon", "op": "Meta", "cc": "US", "city": "Lebanon, IN", "lat": 40.05, "lon": -86.47, "type": "H", "st": "U", "mw": 1000, "basis": "g", "ai": true, "note": "Meta's second Indiana campus, >$10B", "src": [["https://www.mobileworldlive.com/meta/meta-adds-40b-to-us-data-centre-investment/", "Mobile World Live — Meta 1 GW Lebanon, Indiana"]], "checked": "2026-11-21"},
  {"name": "Meta Altoona", "op": "Meta", "cc": "US", "city": "Altoona, IA", "lat": 41.65, "lon": -93.47, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Prineville", "op": "Meta", "cc": "US", "city": "Prineville, OR", "lat": 44.3, "lon": -120.83, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Meta's first self-built data center (2011)"},
  {"name": "Meta Forest City", "op": "Meta", "cc": "US", "city": "Forest City, NC", "lat": 35.33, "lon": -81.87, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Fort Worth", "op": "Meta", "cc": "US", "city": "Fort Worth, TX", "lat": 32.95, "lon": -97.33, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Los Lunas", "op": "Meta", "cc": "US", "city": "Los Lunas, NM", "lat": 34.81, "lon": -106.73, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Eagle Mountain", "op": "Meta", "cc": "US", "city": "Eagle Mountain, UT", "lat": 40.31, "lon": -112.01, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Kansas City", "op": "Meta", "cc": "US", "city": "Kansas City, MO", "lat": 39.3, "lon": -94.68, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Fairwater Wisconsin", "op": "Microsoft", "cc": "US", "city": "Mount Pleasant, WI", "lat": 42.71, "lon": -87.9, "type": "H", "st": "O", "mw": 2263, "basis": "i", "ai": true, "note": "Epoch est. 369 MW IT live, 2,263 MW IT projected (Q2 2028); likely OpenAI training", "src": [["https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin", "Epoch AI — Microsoft Fairwater Wisconsin"], ["https://blogs.microsoft.com/?p=52562570", "Microsoft — Inside the world's most powerful AI datacenter"]], "checked": "2026-11-21", "now_it": 369},
  {"name": "Microsoft Fairwater Atlanta", "op": "Microsoft", "cc": "US", "city": "Fayetteville, GA", "lat": 33.45, "lon": -84.46, "type": "H", "st": "O", "mw": 636, "basis": "i", "ai": true, "note": "Built by QTS; Epoch est. 636 MW IT, GB200; Fairwater site #2 (Oct 2025)", "src": [["https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta", "Epoch AI — Microsoft Fairwater Atlanta"], ["https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/", "Microsoft — Azure AI superfactory"]], "checked": "2026-11-21", "now_it": 636},
  {"name": "Microsoft San Antonio", "op": "Microsoft", "cc": "US", "city": "San Antonio, TX", "lat": 29.42, "lon": -98.49, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Quincy", "op": "Microsoft", "cc": "US", "city": "Quincy, WA", "lat": 47.23, "lon": -119.85, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Boydton", "op": "Microsoft", "cc": "US", "city": "Boydton, VA", "lat": 36.67, "lon": -78.39, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Goodyear / El Mirage", "op": "Microsoft", "cc": "US", "city": "Goodyear, AZ", "lat": 33.44, "lon": -112.36, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft West Des Moines", "op": "Microsoft", "cc": "US", "city": "West Des Moines, IA", "lat": 41.57, "lon": -93.75, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Project Rainier New Carlisle", "op": "Amazon (AWS)", "cc": "US", "city": "New Carlisle, IN", "lat": 41.7, "lon": -86.5, "type": "H", "st": "O", "mw": 2200, "basis": "g", "ai": true, "note": "Largest tracked AI DC: Epoch est. ~1,037 MW IT live (Nov 2026), ~1.9 GW IT by 2028; Trainium2 for Anthropic", "src": [["https://epoch.ai/graphs/largest-ai-data-centers-by-power-capacity", "Epoch AI — Largest AI data centers by power (Nov 2026)"], ["https://siliconangle.com/2025/10/29/aws-opens-11b-project-rainier-data-center-campus-built-anthropic/", "SiliconANGLE — AWS opens $11B Project Rainier campus"]], "checked": "2026-11-21", "now_it": 1037},
  {"name": "AWS Madison County", "op": "Amazon (AWS)", "cc": "US", "city": "Canton, MS", "lat": 32.61, "lon": -90.04, "type": "H", "st": "O", "mw": 1000, "basis": "i", "ai": true, "note": "Project Rainier site; >350 MW IT today, ramping past 1 GW", "src": [["https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus", "Measured AI — AWS New Carlisle campus"]], "checked": "2026-11-21"},
  {"name": "AWS Susquehanna (Cumulus)", "op": "Amazon (AWS)", "cc": "US", "city": "Salem Township, PA", "lat": 41.09, "lon": -76.15, "type": "H", "st": "O", "mw": 960, "basis": "g", "ai": false, "note": "Nuclear-adjacent campus bought from Talen"},
  {"name": "AWS Northern Virginia cluster", "op": "Amazon (AWS)", "cc": "US", "city": "Loudoun / Prince William, VA", "lat": 38.95, "lon": -77.45, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Largest single cloud region (us-east-1)"},
  {"name": "AWS Ohio (New Albany / Hilliard)", "op": "Amazon (AWS)", "cc": "US", "city": "Central Ohio", "lat": 40.03, "lon": -83.1, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Boardman", "op": "Amazon (AWS)", "cc": "US", "city": "Boardman, OR", "lat": 45.84, "lon": -119.7, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Council Bluffs", "op": "Google", "cc": "US", "city": "Council Bluffs, IA", "lat": 41.26, "lon": -95.86, "type": "H", "st": "O", "mw": 237, "basis": "i", "ai": true, "note": "East campus: Epoch est. 237 MW IT, TPU v5e–v7", "src": [["https://epoch.ai/data/ai-data-centers/directory/google-council-bluffs-east", "Epoch AI — Google Council Bluffs (East)"]], "checked": "2026-11-21", "now_it": 237},
  {"name": "Google The Dalles", "op": "Google", "cc": "US", "city": "The Dalles, OR", "lat": 45.6, "lon": -121.18, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Google's first owned data center (2006)"},
  {"name": "Google Mayes County (Pryor)", "op": "Google", "cc": "US", "city": "Pryor, OK", "lat": 36.3, "lon": -95.3, "type": "H", "st": "O", "mw": 368, "basis": "i", "ai": true, "note": "Google's second-largest DC; Pryor North: Epoch est. 368 MW IT (TPU v5p/v5e); further $9B Oklahoma expansion", "src": [["https://epoch.ai/data/ai-data-centers/directory/google-pryor-north", "Epoch AI — Google Pryor (North)"], ["https://siteselection.com/data-centers-oklahoma-gains-ground-in-next-wave-of-data-center-development/", "Site Selection — Oklahoma data centers"]], "checked": "2026-11-21", "now_it": 368},
  {"name": "Google Midlothian", "op": "Google", "cc": "US", "city": "Midlothian, TX", "lat": 32.48, "lon": -96.99, "type": "H", "st": "O", "mw": 103, "basis": "i", "ai": true, "note": "Epoch est. 103 MW IT, TPU", "src": [["https://epoch.ai/data/ai-data-centers/directory/google-midlothian", "Epoch AI — Google Midlothian"]], "checked": "2026-11-21", "now_it": 103},
  {"name": "Google New Albany", "op": "Google", "cc": "US", "city": "New Albany, OH", "lat": 40.09, "lon": -82.8, "type": "H", "st": "O", "mw": 453, "basis": "i", "ai": true, "note": "Central Ohio TPU cluster; Epoch est. ~453 MW IT", "src": [["https://epoch.ai/data/ai-data-centers?tab=cost", "Epoch AI — AI data centers hub"]], "checked": "2026-11-21", "now_it": 453},
  {"name": "Google Lenoir", "op": "Google", "cc": "US", "city": "Lenoir, NC", "lat": 35.91, "lon": -81.54, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CoreWeave Lancaster", "op": "CoreWeave", "cc": "US", "city": "Lancaster, PA", "lat": 40.04, "lon": -76.3, "type": "A", "st": "U", "mw": 100, "basis": "i", "ai": true, "note": "$6B; 100 MW initial, up to 300 MW; Epoch est. ~92 MW IT under construction", "src": [["https://epoch.ai/data/ai-data-centers/directory/coreweave-lancaster-greenfield-site", "Epoch AI — CoreWeave Lancaster"], ["https://www.rcrwireless.com/20250716/ai-infrastructure/coreweave-ai-data", "RCR Wireless — CoreWeave $6B Lancaster"]], "checked": "2026-11-21"},
  {"name": "Applied Digital Polaris Forge 1", "op": "Applied Digital · CoreWeave", "cc": "US", "city": "Ellendale, ND", "lat": 46.0, "lon": -98.52, "type": "A", "st": "O", "mw": 400, "basis": "i", "ai": true, "note": "400 MW leased to CoreWeave; ~250 MW operational after Building 2 phase 2 (Oct 2026)", "src": [["https://epoch.ai/data/ai-data-centers/directory/coreweave-ellendale-nd", "Epoch AI — CoreWeave Ellendale ND"], ["https://convergedigest.com/?p=112622", "Converge Digest — 75 MW phase online"], ["https://baxtel.com/news/data-centers/ntt-amsterdam-1?page=6", "Baxtel — Building 2 phase 2 (Oct 2026)"]], "checked": "2026-11-21", "now_it": 250},
  {"name": "Applied Digital Polaris Forge 2", "op": "Applied Digital", "cc": "US", "city": "Harwood, ND", "lat": 46.98, "lon": -96.9, "type": "A", "st": "U", "mw": 280, "basis": "i", "ai": true, "note": "280 MW campus; 200 MW leased to a hyperscaler, ROFR on 800 MW more; PUE 1.18 target", "src": [["https://capacityglobal.com/news/applied-digital-north-dakota-ai-factory/", "Capacity — Polaris Forge 2 hyperscaler lease"]], "checked": "2026-11-21"},
  {"name": "Core Scientific Denton", "op": "Core Scientific · CoreWeave", "cc": "US", "city": "Denton, TX", "lat": 33.21, "lon": -97.13, "type": "A", "st": "O", "mw": 260, "basis": "i", "ai": true, "note": "~260 MW critical IT for CoreWeave; Epoch est. 262 MW IT live, likely OpenAI workloads", "src": [["https://epoch.ai/data/ai-data-centers/directory/coreweave-denton-tx", "Epoch AI — CoreWeave Denton TX"], ["https://fourweekmba.com/ai-two-texas-sites-hold-786-mw-of-coreweaves-4-2-gw-contracted/", "FourWeekMBA — CoreWeave Texas sites"]], "checked": "2026-11-21", "now_it": 262},
  {"name": "Galaxy Helios", "op": "Galaxy Digital · CoreWeave", "cc": "US", "city": "Dickens County, TX", "lat": 33.62, "lon": -100.84, "type": "A", "st": "O", "mw": 800, "basis": "g", "ai": true, "note": "800 MW gross = 526 MW critical IT for CoreWeave; phase I (133 MW IT) delivered; 1.63 GW site", "src": [["https://www.theblock.co/post/407396/galaxy-delivers-133-mw-of-critical-it-load-to-coreweave-as-helios-bitcoin-mine-turns-ai-hub", "The Block — Galaxy delivers 133 MW to CoreWeave"], ["https://www.datacenterknowledge.com/data-center-construction/galaxy-bets-its-data-center-edge-on-power-not-bragawatts-", "Data Center Knowledge — Galaxy's 1.63 GW Helios"]], "checked": "2026-11-21", "now_it": 133},
  {"name": "IREN Childress", "op": "IREN", "cc": "US", "city": "Childress, TX", "lat": 34.43, "lon": -100.2, "type": "A", "st": "O", "mw": 750, "basis": "g", "ai": true, "note": "576 acres; hosts Microsoft GPU contract", "src": [["https://www.iren.com/data-centers/sweetwater", "IREN — Data center locations"]], "checked": "2026-11-21"},
  {"name": "IREN Sweetwater", "op": "IREN", "cc": "US", "city": "Sweetwater, TX", "lat": 32.47, "lon": -100.41, "type": "A", "st": "U", "mw": 2000, "basis": "g", "ai": true, "note": "2 GW campus; flagship for NVIDIA DSX AI factory design", "src": [["https://www.iren.com/data-centers/sweetwater", "IREN — Sweetwater"], ["https://www.datacenterfrontier.com/machine-learning/news/55377695/land-and-expand-nvidia-iren-coatue-microsoft-switch-cerebras-core-scientific", "Data Center Frontier — NVIDIA and IREN target 5 GW"]], "checked": "2026-11-21"},
  {"name": "Cipher Barber Lake", "op": "Cipher Mining · AWS", "cc": "US", "city": "Colorado City, TX", "lat": 32.39, "lon": -100.86, "type": "A", "st": "U", "mw": 300, "basis": "i", "ai": true, "note": "300 MW lease to AWS"},
  {"name": "TeraWulf Lake Mariner", "op": "TeraWulf · Fluidstack", "cc": "US", "city": "Barker, NY", "lat": 43.35, "lon": -78.55, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "102 MW delivered: 60 MW Core42/G42, 42 MW Fluidstack/Anthropic (Google-backstopped)", "src": [["https://blockspace.media/short/terawulf-coo-83-of-revenue-now-comes-from-ai-as-lake-mariner-nears-completion/", "Blockspace — Lake Mariner 102 MW delivered"], ["https://datacenterrichness.substack.com/p/inside-an-accelerated-ai-data-center", "Data Center Richness — Inside Lake Mariner"]], "checked": "2026-11-21", "now_it": 102},
  {"name": "TeraWulf Abernathy JV", "op": "TeraWulf · Fluidstack", "cc": "US", "city": "Abernathy, TX", "lat": 33.83, "lon": -101.84, "type": "A", "st": "U", "mw": 168, "basis": "i", "ai": true, "note": ""},
  {"name": "Project Jade (Cheyenne)", "op": "Black Hills Energy · Tallgrass · undisclosed tenant", "cc": "US", "city": "Laramie County, WY", "lat": 41.07, "lon": -104.82, "type": "A", "st": "P", "mw": 1800, "basis": "g", "ai": true, "note": "1.8 GW campus fed by 2.7 GW Tallgrass gas hub; Crusoe exited Jun 2026", "src": [["https://www.enverus.com/blog/jade-without-the-builder-crusoe-out-on-wyomings-1-8-gw-project/", "Enverus — Crusoe out of Project Jade (Jun 2026)"], ["https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/", "POWER — Wyoming approves Project Jade"]], "checked": "2026-11-21"},
  {"name": "Poolside Project Horizon", "op": "Poolside · CoreWeave", "cc": "US", "city": "West Texas", "lat": 31.42, "lon": -103.49, "type": "A", "st": "P", "mw": 2000, "basis": "g", "ai": true, "note": "2 GW behind-the-meter gas campus"},
  {"name": "Homer City Energy Campus", "op": "Homer City Redevelopment · AWS (proposed)", "cc": "US", "city": "Homer City, PA", "lat": 40.54, "lon": -79.16, "type": "A", "st": "U", "mw": 4400, "basis": "g", "ai": true, "note": "Former coal plant; ~4.4 GW gas generation, power from 2027", "src": [["https://www.datacenterfrontier.com/energy/article/55404954/from-coal-to-compute-how-pennsylvania-is-rebuilding-power-for-ai-data-centers", "Data Center Frontier — From coal to compute"]], "checked": "2026-11-21"},
  {"name": "Fermi America Project Matador", "op": "Fermi America", "cc": "US", "city": "Amarillo, TX", "lat": 35.3, "lon": -101.6, "type": "A", "st": "P", "mw": 11000, "basis": "g", "ai": true, "note": "$300B private-grid concept; initial 1 GW phase targeted first", "src": [["https://www.enr.com/articles/61083-power-hungry-ai-fueled-data-center-boom-sets-energy-deliverys-new-course", "ENR — Fermi America 11 GW campus"]], "checked": "2026-11-21"},
  {"name": "Switch Citadel Campus", "op": "Switch", "cc": "US", "city": "Tahoe Reno, NV", "lat": 39.55, "lon": -119.45, "type": "C", "st": "O", "mw": 650, "basis": "g", "ai": false, "note": "7.2M sq ft; build-out up to 850 MW", "src": [["https://www.blackridgeresearch.com/blog/top-biggest-data-centers-in-the-world-location-capacity", "Blackridge Research — Biggest data centers in the world"]], "checked": "2026-11-21"},
  {"name": "Switch Core Campus", "op": "Switch", "cc": "US", "city": "Las Vegas, NV", "lat": 36.07, "lon": -115.17, "type": "C", "st": "O", "mw": 495, "basis": "g", "ai": false, "note": "2.34M sq ft today, growing to 3.94M sq ft and 495 MW", "src": [["https://switch.com/las-vegas-campus", "Switch — The Core campus"]], "checked": "2026-11-21"},
  {"name": "QTS Atlanta Fayetteville", "op": "QTS (Blackstone)", "cc": "US", "city": "Fayetteville, GA", "lat": 33.45, "lon": -84.45, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "615-acre 'Project Excalibur' campus; hosts Microsoft Fairwater Atlanta (separate record)", "src": [["https://datacenterfrontier.com/featured/article/11436953/voices-of-the-industry", "Data Center Frontier — The new megacampuses"]], "checked": "2026-11-21"},
  {"name": "QTS Richmond", "op": "QTS (Blackstone)", "cc": "US", "city": "Richmond, VA", "lat": 37.5, "lon": -77.4, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Ashburn DC campus", "op": "Equinix", "cc": "US", "city": "Ashburn, VA", "lat": 39.02, "lon": -77.46, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Major interconnection hub"},
  {"name": "Digital Realty Digital Dulles", "op": "Digital Realty", "cc": "US", "city": "Sterling, VA", "lat": 39.0, "lon": -77.43, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NTT Hillsboro campus", "op": "NTT Global Data Centers", "cc": "US", "city": "Hillsboro, OR", "lat": 45.54, "lon": -122.95, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Aligned Phoenix", "op": "Aligned Data Centers", "cc": "US", "city": "Phoenix, AZ", "lat": 33.4, "lon": -112.0, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CyrusOne Council Bluffs", "op": "CyrusOne", "cc": "US", "city": "Council Bluffs, IA", "lat": 41.23, "lon": -95.85, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Nebius Vineland", "op": "Nebius · Microsoft", "cc": "US", "city": "Vineland, NJ", "lat": 39.49, "lon": -75.03, "type": "A", "st": "U", "mw": 300, "basis": "i", "ai": true, "note": "Up to 300 MW (DataOne-built); Epoch est. 50 MW IT live; capacity contracted to Microsoft", "src": [["https://epoch.ai/data/ai-data-centers/directory/microsoft-nebius-new-jersey", "Epoch AI — Microsoft-Nebius New Jersey"], ["https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey", "Nebius — 300 MW New Jersey"]], "checked": "2026-11-21", "now_it": 50},
  {"name": "Nebius Kansas City", "op": "Nebius", "cc": "US", "city": "Kansas City, MO", "lat": 39.1, "lon": -94.58, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Nebius Mäntsälä", "op": "Nebius", "cc": "FI", "city": "Mäntsälä", "lat": 60.63, "lon": 25.32, "type": "A", "st": "O", "mw": 75, "basis": "i", "ai": true, "note": "Expanded to 75 MW (2026); heat reuse into district heating", "src": [["https://www.datacenterknowledge.com/data-center-construction/nebius-s-10b-310mw-data-center-plan-signals-ai-infrastructure-shift", "Data Center Knowledge — Nebius $10B, 310 MW plan"]], "checked": "2026-11-21"},
  {"name": "Lambda Kansas City", "op": "Lambda", "cc": "US", "city": "Kansas City, MO", "lat": 39.08, "lon": -94.6, "type": "A", "st": "U", "mw": 100, "basis": "i", "ai": true, "note": "Retrofit of 2009 facility: 24 MW / 10k+ Blackwell Ultra initially (early 2026), room for 100 MW+", "src": [["https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city", "Missouri DED — Lambda AI factory"], ["https://www.datacenterfrontier.com/site-selection/article/55328500/land-expand-hyperscale-ai-factory-megascale", "Data Center Frontier — Lambda KC 100 MW+"]], "checked": "2026-11-21"},
  {"name": "CoreWeave Kenilworth", "op": "CoreWeave", "cc": "US", "city": "Kenilworth, NJ", "lat": 40.68, "lon": -74.29, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "CoreWeave Plano", "op": "CoreWeave", "cc": "US", "city": "Plano, TX", "lat": 33.02, "lon": -96.7, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Vantage Ashburn campus", "op": "Vantage Data Centers", "cc": "US", "city": "Ashburn, VA", "lat": 39.03, "lon": -77.5, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CyrusOne Aurora", "op": "CyrusOne", "cc": "US", "city": "Aurora, IL", "lat": 41.76, "lon": -88.32, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty Richardson", "op": "Digital Realty", "cc": "US", "city": "Richardson, TX", "lat": 32.95, "lon": -96.73, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty 350 E Cermak", "op": "Digital Realty", "cc": "US", "city": "Chicago, IL", "lat": 41.85, "lon": -87.62, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Iconic carrier hotel"},
  {"name": "Equinix NY4/NY5 Secaucus", "op": "Equinix", "cc": "US", "city": "Secaucus, NJ", "lat": 40.78, "lon": -74.07, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Financial-markets hub"},
  {"name": "Equinix Silicon Valley campus", "op": "Equinix", "cc": "US", "city": "San Jose, CA", "lat": 37.37, "lon": -121.92, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CoreSite One Wilshire (LA1)", "op": "CoreSite (American Tower)", "cc": "US", "city": "Los Angeles, CA", "lat": 34.05, "lon": -118.26, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "West Coast interconnection hub"},
  {"name": "QTS Chicago", "op": "QTS (Blackstone)", "cc": "US", "city": "Chicago, IL", "lat": 41.88, "lon": -87.65, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "STACK Northern Virginia", "op": "STACK Infrastructure", "cc": "US", "city": "Stafford, VA", "lat": 38.42, "lon": -77.41, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Aligned Plano", "op": "Aligned Data Centers", "cc": "US", "city": "Plano, TX", "lat": 33.05, "lon": -96.75, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Tract Buckeye", "op": "Tract", "cc": "US", "city": "Buckeye, AZ", "lat": 33.37, "lon": -112.58, "type": "C", "st": "P", "mw": null, "basis": "g", "ai": false, "note": "Land/power developer"},
  {"name": "Oracle Ashburn region", "op": "Oracle", "cc": "US", "city": "Ashburn, VA", "lat": 39.01, "lon": -77.48, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "xAI Memphis Southaven power campus", "op": "SpaceXAI (xAI)", "cc": "US", "city": "Southaven, MS", "lat": 34.98, "lon": -90.04, "type": "A", "st": "U", "mw": null, "basis": "g", "ai": true, "note": "Gas turbines + third building ('MACROHARDRR')", "src": [["https://www.datacenterfrontier.com/machine-learning/article/55343403/xais-ai-factories-from-colossus-to-macrohardrr-in-the-gigawatt-era", "Data Center Frontier — xAI's AI factories"]], "checked": "2026-11-21"},
  {"name": "Google Pine Island", "op": "Google", "cc": "US", "city": "Pine Island, MN", "lat": 44.2, "lon": -92.65, "type": "H", "st": "P", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Frankfurt FR8", "op": "Equinix", "cc": "DE", "city": "Frankfurt", "lat": 50.12, "lon": 8.73, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Nscale Glomfjord", "op": "Nscale", "cc": "NO", "city": "Glomfjord", "lat": 66.81, "lon": 13.95, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "Hydro-powered GPU cloud"},
  {"name": "Google Fredericia", "op": "Google", "cc": "DK", "city": "Fredericia", "lat": 55.57, "lon": 9.75, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Sweden Central", "op": "Microsoft", "cc": "SE", "city": "Gävle / Sandviken", "lat": 60.67, "lon": 17.14, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty Madrid", "op": "Digital Realty", "cc": "ES", "city": "Madrid", "lat": 40.42, "lon": -3.7, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Milan ML5", "op": "Equinix", "cc": "IT", "city": "Settimo Milanese", "lat": 45.48, "lon": 9.05, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Iron Mountain Phoenix", "op": "Iron Mountain", "cc": "US", "city": "Phoenix, AZ", "lat": 33.45, "lon": -112.07, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Cologix Johnstown campus", "op": "Cologix", "cc": "US", "city": "Johnstown, OH", "lat": 40.15, "lon": -82.69, "type": "C", "st": "U", "mw": 800, "basis": "g", "ai": false, "note": "Eight data centers, ~$7B", "src": [["https://www.apollotechnical.com/?p=58960", "US Data Center Map: 2026 Project Tracker"]], "checked": "2026-11-21"},
  {"name": "Applied Digital Delta Forge 1", "op": "Applied Digital", "cc": "US", "city": "Boyce, LA", "lat": 31.39, "lon": -92.67, "type": "A", "st": "U", "mw": 430, "basis": "g", "ai": true, "note": "", "src": [["https://www.apollotechnical.com/?p=58960", "US Data Center Map: 2026 Project Tracker"]], "checked": "2026-11-21"},
  {"name": "IREN Oklahoma", "op": "IREN", "cc": "US", "city": "Alva, OK", "lat": 36.8, "lon": -98.67, "type": "A", "st": "P", "mw": 1600, "basis": "g", "ai": true, "note": "2,000 acres", "src": [["https://www.iren.com/data-centers/sweetwater", "IREN — Data center locations"]], "checked": "2026-11-21"},
  {"name": "CloudBurst Central Texas", "op": "CloudBurst Data Centers", "cc": "US", "city": "San Marcos, TX", "lat": 29.88, "lon": -97.94, "type": "A", "st": "U", "mw": 1200, "basis": "g", "ai": true, "note": "Three 400 MW phases", "src": [["https://www.apollotechnical.com/?p=58960", "US Data Center Map: 2026 Project Tracker"]], "checked": "2026-11-21"},
  {"name": "Data4 Escaudain", "op": "Data4", "cc": "FR", "city": "Escaudain", "lat": 50.33, "lon": 3.34, "type": "C", "st": "P", "mw": 700, "basis": "g", "ai": true, "note": "€5B campus", "src": [["https://www.channelinsider.com/ai/news-europe-biggest-ai-data-centers-power-emea-france/", "Channel Insider — Europe's biggest AI data centers"]], "checked": "2026-11-21"},
  {"name": "SoftBank / Sesterce Bosquel", "op": "SoftBank · Sesterce", "cc": "FR", "city": "Bosquel, Somme", "lat": 49.75, "lon": 2.13, "type": "A", "st": "P", "mw": 1000, "basis": "g", "ai": true, "note": "", "src": [["https://www.channelinsider.com/ai/news-europe-biggest-ai-data-centers-power-emea-france/", "Channel Insider — Europe's biggest AI data centers"]], "checked": "2026-11-21"},
  {"name": "Nebius Lappeenranta", "op": "Nebius · Meta", "cc": "FI", "city": "Lappeenranta", "lat": 61.06, "lon": 28.19, "type": "A", "st": "P", "mw": 310, "basis": "i", "ai": true, "note": "$10B, 310 MW; follows Meta agreement", "src": [["https://www.datacenterknowledge.com/data-center-construction/nebius-s-10b-310mw-data-center-plan-signals-ai-infrastructure-shift", "Data Center Knowledge — Nebius $10B, 310 MW plan"]], "checked": "2026-11-21"},
  {"name": "Mistral / EcoDataCenter Borlänge", "op": "Mistral AI · EcoDataCenter", "cc": "SE", "city": "Borlänge", "lat": 60.48, "lon": 15.43, "type": "A", "st": "P", "mw": null, "basis": "i", "ai": true, "note": "€1.2B; first facilities 2027", "src": [["https://www.datacenterdynamics.com/en/news/french-ai-firm-mistral-signs-12bn-deal-to-lease-ecodatacenter-facility-in-sweden/", "DCD — Mistral €1.2bn EcoDataCenter deal"]], "checked": "2026-11-21"},
  {"name": "Schwarz Group Rostock", "op": "Schwarz Digits", "cc": "DE", "city": "Rostock-Dummersdorf", "lat": 54.15, "lon": 12.1, "type": "T", "st": "P", "mw": 240, "basis": "g", "ai": true, "note": "€5.6B; 240 MW by 2033, up to 1 GW by 2045", "src": [["https://www.datacenterdynamics.com/en/news/schwarz-group-commits-56bn-investment-in-data-center-in-mecklenburg-vorpommern-germany/", "DCD — Schwarz €5.6bn Rostock"]], "checked": "2026-11-21"},
  {"name": "Digital Reef East Havering", "op": "Digital Reef", "cc": "GB", "city": "Havering, London", "lat": 51.53, "lon": 0.25, "type": "C", "st": "P", "mw": 600, "basis": "g", "ai": false, "note": "", "src": [["https://www.blackridgeresearch.com/blog/top-latest-list-of-upcoming-data-centers-in-the-uk-united-kingdom", "Blackridge Research — Upcoming UK data centers"]], "checked": "2026-11-21"},
  {"name": "Humain East Riyadh AI campus", "op": "Humain (PIF)", "cc": "SA", "city": "East Riyadh", "lat": 24.75, "lon": 46.95, "type": "A", "st": "P", "mw": 6000, "basis": "g", "ai": true, "note": "6 GW hyperscale AI campus; tender May 2026", "src": [["https://www.meed.com/humain-and-datavolt-start-oxagon-data-centre-work", "MEED — Humain 6 GW east Riyadh tender"]], "checked": "2026-11-21"},
  {"name": "NEXTDC S7 Eastern Creek", "op": "NEXTDC", "cc": "AU", "city": "Eastern Creek, Sydney", "lat": -33.8, "lon": 150.86, "type": "C", "st": "P", "mw": 550, "basis": "i", "ai": true, "note": "Anchor of 'OpenAI for Australia'", "src": [["https://www.nextdc.com/hyperscale-map", "NEXTDC — Hyperscale map"], ["https://baxtel.com/data-center/cdc-marsden-park-campus", "Baxtel — S7 and OpenAI for Australia"]], "checked": "2026-11-21"},
  {"name": "Applied Digital Delta Forge 2", "op": "Applied Digital", "cc": "US", "city": "Brookwood, AL", "lat": 33.26, "lon": -87.32, "type": "A", "st": "P", "mw": 210, "basis": "i", "ai": true, "note": "$3.2B, 210 MW critical IT", "src": [["https://baxtel.com/news/data-centers/applied-digital-delta-forge-2", "Baxtel — Delta Forge 2, Brookwood AL"]], "checked": "2026-11-21"},
  {"name": "TeraWulf Kentucky campus (Anthropic lease)", "op": "TeraWulf · Anthropic", "cc": "US", "city": "Kentucky", "lat": 37.84, "lon": -84.27, "type": "A", "st": "P", "mw": null, "basis": "i", "ai": true, "note": "$19B, 20-year lease signed Jul 2026; marker is representative", "src": [["https://www.datacenterdynamics.com/en/company/infhra/", "DCD — Anthropic $19bn Kentucky lease with TeraWulf"]], "checked": "2026-11-21"},
  {"name": "Wonder Valley AI campus", "op": "O'Leary Digital", "cc": "CA", "city": "Greenview, AB", "lat": 55.1, "lon": -118.2, "type": "A", "st": "P", "mw": 7500, "basis": "g", "ai": true, "note": "Part of O'Leary Digital's 15 GW plan across Alberta and Utah; long-dated", "src": [["https://briefglance.com/articles/olearys-15gw-ai-bet-faces-power-and-people-hurdles", "BriefGlance — O'Leary's 15 GW plan"]], "checked": "2026-11-21"},
  {"name": "Bell AI Fabric — Kamloops (Hillside / TRU)", "op": "Bell Canada", "cc": "CA", "city": "Kamloops, BC", "lat": 50.67, "lon": -120.33, "type": "T", "st": "U", "mw": 26, "basis": "i", "ai": true, "note": "26 MW site; Bell AI Fabric has ~400 MW committed, ≥800 MW planned", "src": [["https://businessmarkets.bell.ca/economic-impact", "Bell — AI Fabric economic impact"]], "checked": "2026-11-21"},
  {"name": "Telus Sovereign AI Factory", "op": "Telus", "cc": "CA", "city": "Rimouski, QC", "lat": 48.45, "lon": -68.52, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "Opened Sep 2025, sold out; B.C. cluster proposed (May 2026)", "src": [["https://www.rcrwireless.com/20260512/carriers/telus-ai-data-centers", "RCR Wireless — Telus expands sovereign AI plans"]], "checked": "2026-11-21"},
  {"name": "QScale Q01", "op": "QScale", "cc": "CA", "city": "Lévis, QC", "lat": 46.75, "lon": -71.18, "type": "C", "st": "O", "mw": 142, "basis": "g", "ai": true, "note": "$1.2B, 142 MW AI campus; HPE AI cloud anchor", "src": [["https://thelogic.co/news/exclusive/qscale-ai-data-centre-ontario/", "The Logic — QScale"]], "checked": "2026-11-21"},
  {"name": "eStruxture MTL-3", "op": "eStruxture", "cc": "CA", "city": "Montréal, QC", "lat": 45.5, "lon": -73.57, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Cologix Montréal campus", "op": "Cologix", "cc": "CA", "city": "Montréal, QC", "lat": 45.47, "lon": -73.6, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix TR2", "op": "Equinix", "cc": "CA", "city": "Toronto, ON", "lat": 43.65, "lon": -79.38, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Canada Central", "op": "Microsoft", "cc": "CA", "city": "Toronto, ON", "lat": 43.7, "lon": -79.42, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Toronto region", "op": "Google", "cc": "CA", "city": "Toronto, ON", "lat": 43.72, "lon": -79.45, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Calgary region", "op": "Amazon (AWS)", "cc": "CA", "city": "Calgary, AB", "lat": 51.05, "lon": -114.07, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Beacon AI Centers Alberta", "op": "Beacon AI Centers", "cc": "CA", "city": "Alberta", "lat": 53.55, "lon": -113.49, "type": "A", "st": "P", "mw": null, "basis": "g", "ai": true, "note": "Multi-site AI campus pipeline"},
  {"name": "Vantage Québec City", "op": "Vantage Data Centers", "cc": "CA", "city": "Québec City, QC", "lat": 46.81, "lon": -71.21, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Scala AI City", "op": "Scala Data Centers", "cc": "BR", "city": "Eldorado do Sul, RS", "lat": -30.08, "lon": -51.62, "type": "A", "st": "P", "mw": 4750, "basis": "g", "ai": true, "note": "Phased; first phase ~54 MW"},
  {"name": "Ascenty Campinas", "op": "Ascenty (Digital Realty)", "cc": "BR", "city": "Campinas, SP", "lat": -22.91, "lon": -47.06, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix São Paulo SP campus", "op": "Equinix", "cc": "BR", "city": "São Paulo, SP", "lat": -23.55, "lon": -46.63, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "TikTok Pecém data center", "op": "ByteDance · Omnia", "cc": "BR", "city": "Caucaia, CE", "lat": -3.55, "lon": -38.82, "type": "H", "st": "P", "mw": null, "basis": "g", "ai": false, "note": "Wind-powered campus in Pecém zone"},
  {"name": "CloudHQ Querétaro", "op": "CloudHQ", "cc": "MX", "city": "Querétaro", "lat": 20.59, "lon": -100.39, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Mexico (Central)", "op": "Amazon (AWS)", "cc": "MX", "city": "Querétaro", "lat": 20.62, "lon": -100.42, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Mexico Central", "op": "Microsoft", "cc": "MX", "city": "Querétaro", "lat": 20.56, "lon": -100.36, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Santiago (Quilicura)", "op": "Google", "cc": "CL", "city": "Santiago", "lat": -33.36, "lon": -70.73, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Stargate Argentina (Sur Energy)", "op": "OpenAI · Sur Energy", "cc": "AR", "city": "Patagonia", "lat": -41.13, "lon": -71.31, "type": "A", "st": "P", "mw": 500, "basis": "g", "ai": true, "note": "LOI Oct 2025; up to 500 MW, ~US$25B; first 100 MW phase targeted 2027", "src": [["https://convergedigest.com/?p=106144", "Converge Digest — Stargate Argentina"], ["https://aiweekly.co/alerts/hyperscalers-court-argentine-patagonia-for-ai-data-centers", "AI Weekly / Reuters — Patagonia AI data centers"]], "checked": "2026-11-21"},
  {"name": "Nscale Loughton", "op": "Nscale · Microsoft", "cc": "GB", "city": "Loughton, Essex", "lat": 51.65, "lon": 0.07, "type": "A", "st": "U", "mw": 90, "basis": "i", "ai": true, "note": "50 MW scaling to 90 MW; ~23k GB300", "src": [["https://www.computerweekly.com/news/366639801/AI-factory-builder-Nscale-announces-another-2bn-of-funding", "Computer Weekly — Nscale $2bn funding"]], "checked": "2026-11-21"},
  {"name": "Stargate UK Cobalt Park", "op": "Nscale · OpenAI", "cc": "GB", "city": "North Tyneside", "lat": 55.02, "lon": -1.52, "type": "A", "st": "P", "mw": null, "basis": "i", "ai": true, "note": "OpenAI paused Stargate UK in Apr 2026", "src": [["https://www.itpro.com/infrastructure/has-another-openai-stargate-project-hit-the-rocks", "ITPro — Has another Stargate project hit the rocks?"]], "checked": "2026-11-21"},
  {"name": "QTS Cambois", "op": "QTS (Blackstone)", "cc": "GB", "city": "Blyth, Northumberland", "lat": 55.16, "lon": -1.53, "type": "C", "st": "P", "mw": 720, "basis": "g", "ai": true, "note": "720 MW; outline planning approved; North East AI Growth Zone", "src": [["https://www.blackridgeresearch.com/blog/top-latest-list-of-upcoming-data-centers-in-the-uk-united-kingdom", "Blackridge Research — Upcoming UK data centers"], ["https://qtsdatacenters.com/?p=2323", "QTS — Cambois campus"]], "checked": "2026-11-21"},
  {"name": "Google Waltham Cross", "op": "Google", "cc": "GB", "city": "Waltham Cross, Herts", "lat": 51.69, "lon": -0.03, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Slough campus (LD4–LD6)", "op": "Equinix", "cc": "GB", "city": "Slough", "lat": 51.51, "lon": -0.6, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Virtus London campus", "op": "Virtus (STT GDC)", "cc": "GB", "city": "Slough / Hayes", "lat": 51.52, "lon": -0.58, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Ark Park Royal", "op": "Ark Data Centres", "cc": "GB", "city": "Park Royal, London", "lat": 51.53, "lon": -0.28, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Kao Data Harlow", "op": "Kao Data", "cc": "GB", "city": "Harlow, Essex", "lat": 51.77, "lon": 0.11, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "KLON-03 (17.6 MW, liquid-cooled) under construction; Nebius 22 MW lease (Jun 2026)", "src": [["https://kaodata.com/discover/news/kao-data-announces-construction-of-a-new-17-6mw-liquid-cooled-ai-data-centre-in-harlow", "Kao Data — KLON-03"], ["https://www.datacentermap.com/united-kingdom/london/kao-data-harlow-campus/", "Data Center Map — Kao Data Harlow"]], "checked": "2026-11-21"},
  {"name": "Telehouse London Docklands", "op": "Telehouse (KDDI)", "cc": "GB", "city": "London Docklands", "lat": 51.51, "lon": 0.0, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Home of LINX"},
  {"name": "Global Switch London East", "op": "Global Switch", "cc": "GB", "city": "London Docklands", "lat": 51.51, "lon": -0.01, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty London (LHR)", "op": "Digital Realty", "cc": "GB", "city": "Slough / Heathrow", "lat": 51.5, "lon": -0.55, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Elsham Tech Park", "op": "Elsham Tech Park Ltd", "cc": "GB", "city": "Elsham, Lincolnshire", "lat": 53.59, "lon": -0.45, "type": "A", "st": "P", "mw": 1000, "basis": "g", "ai": true, "note": "1 GW; planning submitted 2025, construction from 2027", "src": [["https://www.blackridgeresearch.com/blog/top-latest-list-of-upcoming-data-centers-in-the-uk-united-kingdom", "Blackridge Research — Upcoming UK data centers"]], "checked": "2026-11-21"},
  {"name": "Microsoft UK South", "op": "Microsoft", "cc": "GB", "city": "London", "lat": 51.48, "lon": -0.4, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS London region", "op": "Amazon (AWS)", "cc": "GB", "city": "London", "lat": 51.5, "lon": -0.3, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Pure DC London", "op": "Pure DC", "cc": "GB", "city": "Park Royal, London", "lat": 51.53, "lon": -0.27, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Grange Castle", "op": "Microsoft", "cc": "IE", "city": "Clondalkin, Dublin", "lat": 53.32, "lon": -6.42, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Grange Castle", "op": "Google", "cc": "IE", "city": "Clondalkin, Dublin", "lat": 53.32, "lon": -6.43, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Mulhuddart", "op": "Amazon (AWS)", "cc": "IE", "city": "Mulhuddart, Dublin", "lat": 53.4, "lon": -6.4, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Clonee", "op": "Meta", "cc": "IE", "city": "Clonee, Meath", "lat": 53.41, "lon": -6.44, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Dublin campus", "op": "Equinix", "cc": "IE", "city": "Dublin", "lat": 53.35, "lon": -6.26, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty Clonshaugh", "op": "Digital Realty", "cc": "IE", "city": "Clonshaugh, Dublin", "lat": 53.4, "lon": -6.21, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CyrusOne Grange Castle", "op": "CyrusOne", "cc": "IE", "city": "Grange Castle, Dublin", "lat": 53.32, "lon": -6.41, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "EdgeConneX Dublin", "op": "EdgeConneX", "cc": "IE", "city": "Dublin", "lat": 53.38, "lon": -6.35, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Echelon Arklow", "op": "Echelon Data Centres", "cc": "IE", "city": "Arklow, Wicklow", "lat": 52.8, "lon": -6.16, "type": "C", "st": "P", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Frankfurt campus", "op": "Equinix", "cc": "DE", "city": "Frankfurt", "lat": 50.11, "lon": 8.68, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty Frankfurt campus", "op": "Digital Realty", "cc": "DE", "city": "Frankfurt", "lat": 50.1, "lon": 8.74, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NTT Frankfurt campus", "op": "NTT Global Data Centers", "cc": "DE", "city": "Frankfurt", "lat": 50.12, "lon": 8.62, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Vantage Offenbach", "op": "Vantage Data Centers", "cc": "DE", "city": "Offenbach", "lat": 50.1, "lon": 8.77, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CyrusOne Frankfurt", "op": "CyrusOne", "cc": "DE", "city": "Frankfurt", "lat": 50.13, "lon": 8.7, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Telekom Industrial AI Cloud", "op": "Deutsche Telekom · NVIDIA", "cc": "DE", "city": "Munich", "lat": 48.14, "lon": 11.58, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "~10k Blackwell GPUs"},
  {"name": "Microsoft Rhineland (Bergheim / Elsdorf)", "op": "Microsoft", "cc": "DE", "city": "Bergheim, NRW", "lat": 50.96, "lon": 6.64, "type": "H", "st": "U", "mw": 500, "basis": "g", "ai": false, "note": "€3.2B, three sites; ~520 MVA grid connection; ground broken 2026", "src": [["https://heise.de/-11216864", "heise — Microsoft NRW cluster 520 MW"], ["https://www.gtai.de/en/invest/industries/digital-economy/groundbreaking-ceremony-at-microsoft-s-nrw-data-center--1990680", "GTAI — Groundbreaking (Apr 2026)"]], "checked": "2026-11-21"},
  {"name": "Google Hanau", "op": "Google", "cc": "DE", "city": "Hanau", "lat": 50.13, "lon": 8.92, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Brandenburg", "op": "Amazon (AWS)", "cc": "DE", "city": "Brandenburg", "lat": 52.4, "lon": 13.06, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Schwarz Group Lübbenau", "op": "Schwarz Digits", "cc": "DE", "city": "Lübbenau, Brandenburg", "lat": 51.87, "lon": 13.96, "type": "T", "st": "U", "mw": 200, "basis": "g", "ai": true, "note": "€11B; up to 200 MW grid connection; ground broken Nov 2025, due end-2027", "src": [["https://www.jll.com/de-de/insights/die-neue-geografie-des-deutschen-rechenzentrumsmarktes", "JLL — Germany data centre market"], ["https://www.datacentermap.com/germany/lubbenau/stackit-lubbenau/", "Data Center Map — STACKIT Lübbenau"]], "checked": "2026-11-21"},
  {"name": "Virtus Wustermark", "op": "Virtus (STT GDC)", "cc": "DE", "city": "Wustermark, Berlin", "lat": 52.55, "lon": 12.95, "type": "C", "st": "U", "mw": 300, "basis": "i", "ai": false, "note": "300 MW campus planned; construction began 2023 (first 204 MW)", "src": [["https://www.datacenterdynamics.com/en/tags/wustermark/", "DCD — Wustermark"]], "checked": "2026-11-21"},
  {"name": "Microsoft Middenmeer", "op": "Microsoft", "cc": "NL", "city": "Middenmeer", "lat": 52.81, "lon": 5.0, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Eemshaven", "op": "Google", "cc": "NL", "city": "Eemshaven", "lat": 53.44, "lon": 6.83, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Middenmeer", "op": "Google", "cc": "NL", "city": "Middenmeer", "lat": 52.8, "lon": 5.02, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Amsterdam campus", "op": "Equinix", "cc": "NL", "city": "Amsterdam", "lat": 52.3, "lon": 4.94, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Around AMS-IX"},
  {"name": "Digital Realty Amsterdam", "op": "Digital Realty", "cc": "NL", "city": "Schiphol-Rijk", "lat": 52.28, "lon": 4.75, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NorthC Amsterdam", "op": "NorthC", "cc": "NL", "city": "Amsterdam", "lat": 52.37, "lon": 4.9, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Nebius Amsterdam", "op": "Nebius", "cc": "NL", "city": "Amsterdam", "lat": 52.35, "lon": 4.85, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Campus IA Fouju", "op": "MGX · Bpifrance · Mistral · NVIDIA", "cc": "FR", "city": "Fouju, Seine-et-Marne", "lat": 48.58, "lon": 2.78, "type": "A", "st": "P", "mw": 1400, "basis": "g", "ai": true, "note": "Construction from H2 2026, operations 2028", "src": [["https://www.channelinsider.com/ai/news-europe-biggest-ai-data-centers-power-emea-france/", "Channel Insider — Europe's biggest AI data centers"]], "checked": "2026-11-21"},
  {"name": "Fluidstack France 1 GW project (withdrawn)", "op": "Fluidstack", "cc": "FR", "city": "France", "lat": 46.6, "lon": 1.88, "type": "A", "st": "P", "mw": null, "basis": "g", "ai": true, "note": "Announced Feb 2025 (1 GW, €10B); Fluidstack withdrew Mar 2026 — excluded from totals", "src": [["https://www.bloomberg.com/news/articles/2026-03-18/fluidstack-drops-out-of-marquee-10-billion-ai-project-in-france", "Bloomberg — Fluidstack drops out (Mar 2026)"]], "checked": "2026-11-21"},
  {"name": "Mistral Compute", "op": "Mistral AI · Fluidstack · Eclairion", "cc": "FR", "city": "Bruyères-le-Châtel, Essonne", "lat": 48.59, "lon": 2.19, "type": "A", "st": "O", "mw": 40, "basis": "i", "ai": true, "note": "40 MW Eclairion site, expandable to 100 MW+; 18k Grace Blackwell", "src": [["https://thenextweb.com/news/mistral-data-centre-buildout-asml-compute-units", "The Next Web — Mistral compute buildout"], ["https://insidehpc.com/2025/03/fluidstack-and-eclairion-to-deliver-18k-gpu-supercomputer-in-france/", "insideHPC — 18k GPU supercomputer"]], "checked": "2026-11-21"},
  {"name": "Data4 Marcoussis", "op": "Data4", "cc": "FR", "city": "Marcoussis, Essonne", "lat": 48.64, "lon": 2.23, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Paris campus", "op": "Equinix", "cc": "FR", "city": "Saint-Denis", "lat": 48.93, "lon": 2.36, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Realty Paris (La Courneuve)", "op": "Digital Realty", "cc": "FR", "city": "La Courneuve", "lat": 48.93, "lon": 2.39, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Telehouse Paris Magny", "op": "Telehouse (KDDI)", "cc": "FR", "city": "Magny-les-Hameaux", "lat": 48.74, "lon": 2.06, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Scaleway DC5", "op": "Scaleway", "cc": "FR", "city": "Saint-Ouen-l'Aumône", "lat": 49.05, "lon": 2.11, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Microsoft France Central", "op": "Microsoft", "cc": "FR", "city": "Paris", "lat": 48.86, "lon": 2.35, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Brookfield Cambrai AI campus", "op": "Brookfield · Data4", "cc": "FR", "city": "Cambrai", "lat": 50.18, "lon": 3.24, "type": "A", "st": "P", "mw": 1000, "basis": "g", "ai": true, "note": ""},
  {"name": "Nscale Narvik (ex-Stargate Norway)", "op": "Nscale · Microsoft", "cc": "NO", "city": "Kvandal, Narvik", "lat": 68.43, "lon": 17.43, "type": "A", "st": "U", "mw": 230, "basis": "i", "ai": true, "note": "230 MW, ambition +290 MW; Microsoft took over OpenAI's capacity", "src": [["https://www.bloomberg.com/news/articles/2026-04-14/microsoft-takes-over-norway-openai-data-center-capacity", "Bloomberg — Microsoft takes over Stargate Norway capacity"], ["https://www.hpcwire.com/?p=182665", "HPCwire — Stargate Norway launch"]], "checked": "2026-11-21"},
  {"name": "Green Mountain Rjukan", "op": "Green Mountain", "cc": "NO", "city": "Rjukan", "lat": 59.88, "lon": 8.59, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Hydro-powered"},
  {"name": "Meta Luleå", "op": "Meta", "cc": "SE", "city": "Luleå", "lat": 65.58, "lon": 22.15, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Brookfield Strängnäs AI campus", "op": "Brookfield", "cc": "SE", "city": "Strängnäs", "lat": 59.38, "lon": 17.03, "type": "A", "st": "P", "mw": 750, "basis": "i", "ai": true, "note": "~$10B; 750 MW IT; 10–15 year build", "src": [["https://blackridgeresearch.com/blog/largest-latest-top-upcoming-data-centers-in-europe-list", "Blackridge Research — Upcoming data centers in Europe"]], "checked": "2026-11-21"},
  {"name": "EcoDataCenter Falun", "op": "EcoDataCenter", "cc": "SE", "city": "Falun", "lat": 60.61, "lon": 15.63, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Meta Odense", "op": "Meta", "cc": "DK", "city": "Odense", "lat": 55.4, "lon": 10.39, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Hamina", "op": "Google", "cc": "FI", "city": "Hamina", "lat": 60.57, "lon": 27.2, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Seawater-cooled former paper mill"},
  {"name": "Microsoft Espoo", "op": "Microsoft", "cc": "FI", "city": "Espoo", "lat": 60.21, "lon": 24.66, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": "District-heat reuse"},
  {"name": "atNorth Akureyri", "op": "atNorth", "cc": "IS", "city": "Akureyri", "lat": 65.68, "lon": -18.09, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Verne Keflavík", "op": "Verne Global", "cc": "IS", "city": "Keflavík", "lat": 63.98, "lon": -22.6, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Start Campus Sines", "op": "Start Campus", "cc": "PT", "city": "Sines", "lat": 37.95, "lon": -8.87, "type": "C", "st": "O", "mw": 1200, "basis": "i", "ai": true, "note": "SIN01 (26 MW) live since Q4 2024; six buildings, 1.2 GW IT secured", "src": [["https://www.datacenterdynamics.com/en/news/start-campus-and-schneider-electric-partner-to-deliver-26mw-data-center-in-sines-portugal/", "DCD — Start Campus SIN01, 26 MW"], ["https://www.lightwaveonline.com/data-center/article/55132459/start-campus-secures-data-center-power-boost", "Lightwave — 1.2 GW IT secured"]], "checked": "2026-11-21"},
  {"name": "Microsoft Aragón", "op": "Microsoft", "cc": "ES", "city": "Zaragoza", "lat": 41.65, "lon": -0.88, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Aragón", "op": "Amazon (AWS)", "cc": "ES", "city": "Aragón", "lat": 41.7, "lon": -0.8, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Talavera de la Reina", "op": "Meta", "cc": "ES", "city": "Talavera de la Reina", "lat": 39.96, "lon": -4.83, "type": "H", "st": "P", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Blackstone Calatorao", "op": "QTS (Blackstone)", "cc": "ES", "city": "Calatorao, Aragón", "lat": 41.52, "lon": -1.35, "type": "C", "st": "P", "mw": null, "basis": "g", "ai": false, "note": ""},
  {"name": "Data4 Milan", "op": "Data4", "cc": "IT", "city": "Cornaredo, Milan", "lat": 45.5, "lon": 9.03, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Italy North", "op": "Microsoft", "cc": "IT", "city": "Milan", "lat": 45.46, "lon": 9.19, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Stargate UAE", "op": "G42 / Khazna · OpenAI · Oracle", "cc": "AE", "city": "Abu Dhabi", "lat": 24.45, "lon": 54.62, "type": "A", "st": "U", "mw": 1000, "basis": "i", "ai": true, "note": "First 200 MW due 2026; within 5 GW UAE–US AI Campus", "src": [["https://openai.com/index/introducing-stargate-uae", "OpenAI — Introducing Stargate UAE"], ["https://www.thenationalnews.com/business/2025/12/05/stargate-uaes-first-phase-to-be-completed-in-third-quarter-of-2026", "The National — First phase Q3 2026"]], "checked": "2026-11-21"},
  {"name": "UAE–US AI Campus (remainder)", "op": "G42 / Khazna", "cc": "AE", "city": "Abu Dhabi", "lat": 24.4, "lon": 54.7, "type": "A", "st": "P", "mw": 4000, "basis": "g", "ai": true, "note": "5 GW campus excluding the 1 GW Stargate cluster", "src": [["https://gulfnews.com/business/markets/stargate-uae-first-phase-of-200mw-to-complete-by-2026-1.500310364", "Gulf News — Stargate UAE within 5 GW campus"]], "checked": "2026-11-21"},
  {"name": "Khazna Ajman", "op": "Khazna Data Centers", "cc": "AE", "city": "Ajman", "lat": 25.41, "lon": 55.51, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Humain Riyadh", "op": "Humain (PIF)", "cc": "SA", "city": "Riyadh", "lat": 24.71, "lon": 46.68, "type": "A", "st": "U", "mw": 100, "basis": "g", "ai": true, "note": "Initial capacity up to 100 MW", "src": [["https://finance.yahoo.com/news/saudis-humain-launch-data-centers-191120744.html", "Reuters via Yahoo — Humain data centers"]], "checked": "2026-11-21"},
  {"name": "Humain Dammam", "op": "Humain (PIF)", "cc": "SA", "city": "Dammam", "lat": 26.43, "lon": 50.1, "type": "A", "st": "U", "mw": 100, "basis": "g", "ai": true, "note": "Initial capacity up to 100 MW", "src": [["https://finance.yahoo.com/news/saudis-humain-launch-data-centers-191120744.html", "Reuters via Yahoo — Humain data centers"]], "checked": "2026-11-21"},
  {"name": "DataVolt Oxagon", "op": "DataVolt", "cc": "SA", "city": "Oxagon, NEOM", "lat": 27.1, "lon": 35.2, "type": "A", "st": "U", "mw": 1500, "basis": "g", "ai": true, "note": "1.5 GW campus; 360 MW first phase under construction since Aug 2026 (100 MW with Humain), due 2028", "src": [["https://datacenterdynamics.com/en/news/humain-breaks-ground-on-neoms-oxagon-data-center", "DCD — Humain breaks ground at Oxagon"], ["https://www.neom.com/en-us/newsroom/HUMAIN-and-DataVolt-to-develop-AI-data-center-in-NEOM", "NEOM — Humain & DataVolt"]], "checked": "2026-11-21"},
  {"name": "Microsoft Qatar Central", "op": "Microsoft", "cc": "QA", "city": "Doha", "lat": 25.29, "lon": 51.53, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Teraco JB1 Isando", "op": "Teraco (Digital Realty)", "cc": "ZA", "city": "Johannesburg", "lat": -26.15, "lon": 28.2, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Teraco CT2", "op": "Teraco (Digital Realty)", "cc": "ZA", "city": "Cape Town", "lat": -33.9, "lon": 18.6, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Africa Data Centres Lagos", "op": "Africa Data Centres", "cc": "NG", "city": "Lagos", "lat": 6.52, "lon": 3.38, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Rack Centre LGS1", "op": "Rack Centre", "cc": "NG", "city": "Lagos", "lat": 6.45, "lon": 3.42, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "iXAfrica Nairobi", "op": "iXAfrica", "cc": "KE", "city": "Nairobi", "lat": -1.29, "lon": 36.82, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "SoftBank Hokkaido Tomakomai AI DC", "op": "SoftBank Corp.", "cc": "JP", "city": "Tomakomai, Hokkaido", "lat": 42.64, "lon": 141.6, "type": "A", "st": "U", "mw": 300, "basis": "g", "ai": true, "note": "50 MW at FY2026 opening; >300 MW, potential 1 GW", "src": [["https://cdn.softbank.jp/en/corp/sustainability/materiality/next-gen-infra/", "SoftBank — Next-gen infrastructure"], ["https://www.softbank.jp/en/sbnews/entry/20260225_01", "SoftBank — Inside the Tomakomai AI data center"]], "checked": "2026-11-21"},
  {"name": "SoftBank Sakai AI DC", "op": "SoftBank Corp.", "cc": "JP", "city": "Sakai, Osaka", "lat": 34.56, "lon": 135.45, "type": "A", "st": "U", "mw": 140, "basis": "g", "ai": true, "note": "140 MW AI DC from FY2027 on former Sharp plant; aiming >240 MW", "src": [["https://cdn.softbank.jp/en/corp/sustainability/materiality/next-gen-infra/", "SoftBank — Next-gen infrastructure"], ["https://techcrunch.com/?p=2980525", "TechCrunch — SoftBank buys Sharp plant"]], "checked": "2026-11-21"},
  {"name": "KDDI Osaka Sakai AI DC", "op": "KDDI", "cc": "JP", "city": "Sakai, Osaka", "lat": 34.57, "lon": 135.44, "type": "A", "st": "O", "mw": 48, "basis": "g", "ai": true, "note": "Opened Jan 22, 2026; GB200 NVL72, direct liquid cooling", "src": [["https://newsroom.kddi.com/english/news/detail/kddi_nr-916_4323.html", "KDDI — Osaka Sakai DC opens"], ["https://www.mingtiandi.com/real-estate/data-centres/japans-kddi-launches-service-at-48mw-osaka-ai-data-centre/", "Mingtiandi — KDDI 48 MW Osaka AI DC"]], "checked": "2026-11-21"},
  {"name": "Goodman Tsukuba (TY005)", "op": "Goodman Group", "cc": "JP", "city": "Tsukuba, Ibaraki", "lat": 36.08, "lon": 140.11, "type": "C", "st": "U", "mw": 1000, "basis": "g", "ai": true, "note": "Up to 1 GW at full build-out", "src": [["https://www.blackridgeresearch.com/blog/latest-list-top-largest-data-center-projects-japan", "Blackridge Research — Largest data center projects in Japan"]], "checked": "2026-11-21"},
  {"name": "AirTrunk TOK1", "op": "AirTrunk (Blackstone)", "cc": "JP", "city": "Inzai, Chiba", "lat": 35.83, "lon": 140.15, "type": "C", "st": "O", "mw": 300, "basis": "i", "ai": true, "note": "300+ MW campus; opened 2021 with ~60 MW; US$1B liquid-cooling upgrade", "src": [["https://airtrunk.com/?p=6399", "AirTrunk — TOK1 Tokyo East"], ["https://www.sphericalinsights.com/blogs/airtrunk-commits-us-1-billion-to-upgrade-japan-data-centre-for-ai-workloads", "Spherical Insights — AirTrunk US$1B TOK1 upgrade"]], "checked": "2026-11-21"},
  {"name": "NTT Tokyo Inzai campus", "op": "NTT DATA", "cc": "JP", "city": "Inzai, Chiba", "lat": 35.82, "lon": 140.14, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NTT Tokyo TKY12", "op": "NTT DATA", "cc": "JP", "city": "Inzai-Shiroi, Chiba", "lat": 35.8, "lon": 140.1, "type": "C", "st": "P", "mw": 200, "basis": "i", "ai": false, "note": "~200 MW announced", "src": [["https://www.datacenterdynamics.com/en/tags/chiba/", "DCD — NTT plans 200 MW campus outside Tokyo (Apr 2026)"]], "checked": "2026-11-21"},
  {"name": "MC Digital Realty NRT campus", "op": "MC Digital Realty", "cc": "JP", "city": "Inzai, Chiba", "lat": 35.81, "lon": 140.13, "type": "C", "st": "O", "mw": 104, "basis": "i", "ai": false, "note": "NRT10/12/14; 104 MW after NRT14 opened Apr 2026", "src": [["https://www.datacentermap.com/japan/tokyo/2-4-otsuka-2-chome-nrt14/", "Data Center Map — NRT14"], ["https://telecomtalk.info/mcdigital-realty-opens-datacenter-in-inzai-japan/924950/", "TelecomTalk — NRT12"]], "checked": "2026-11-21"},
  {"name": "Equinix Tokyo campus (TY11 etc.)", "op": "Equinix", "cc": "JP", "city": "Tokyo", "lat": 35.66, "lon": 139.75, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Osaka campus", "op": "Equinix", "cc": "JP", "city": "Osaka", "lat": 34.69, "lon": 135.5, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Colt DCS Inzai", "op": "Colt DCS", "cc": "JP", "city": "Inzai, Chiba", "lat": 35.84, "lon": 140.14, "type": "C", "st": "O", "mw": 50, "basis": "i", "ai": false, "note": "Four buildings, 50 MW IT", "src": [["https://www.datacentermap.com/japan/tokyo/colt-inzai-data-centre-campus/", "Data Center Map — Colt Inzai campus"]], "checked": "2026-11-21"},
  {"name": "Google Inzai", "op": "Google", "cc": "JP", "city": "Inzai, Chiba", "lat": 35.83, "lon": 140.13, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Tokyo region", "op": "Amazon (AWS)", "cc": "JP", "city": "Tokyo metro", "lat": 35.7, "lon": 139.8, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Osaka region", "op": "Amazon (AWS)", "cc": "JP", "city": "Osaka metro", "lat": 34.7, "lon": 135.55, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Japan East", "op": "Microsoft", "cc": "JP", "city": "Tokyo / Saitama", "lat": 35.86, "lon": 139.65, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Japan West", "op": "Microsoft", "cc": "JP", "city": "Osaka", "lat": 34.72, "lon": 135.45, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Oracle Tokyo / Osaka regions", "op": "Oracle", "cc": "JP", "city": "Tokyo", "lat": 35.64, "lon": 139.7, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Sakura Internet Ishikari", "op": "Sakura Internet", "cc": "JP", "city": "Ishikari, Hokkaido", "lat": 43.22, "lon": 141.31, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "GPU cloud expansion"},
  {"name": "Kyocera Ishikari renewable DC", "op": "Kyocera Communication Systems", "cc": "JP", "city": "Ishikari, Hokkaido", "lat": 43.24, "lon": 141.33, "type": "T", "st": "U", "mw": 15, "basis": "i", "ai": false, "note": "100% renewable; Q1 2026", "src": [["https://www.jll.com/en-sea/insights/japan-s-data-centre-market-expands-beyond-tokyo-and-osaka", "JLL — Ishikari Renewable Energy Data Centre"]], "checked": "2026-11-21"},
  {"name": "IIJ Shirakawa DCC", "op": "IIJ", "cc": "JP", "city": "Shirakawa, Fukushima", "lat": 37.13, "lon": 140.21, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "KDDI Telehouse Tama", "op": "KDDI / Telehouse", "cc": "JP", "city": "Tama, Tokyo", "lat": 35.64, "lon": 139.45, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Princeton Digital TY1", "op": "Princeton Digital Group", "cc": "JP", "city": "Inzai, Chiba", "lat": 35.8, "lon": 140.16, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "STACK Tokyo", "op": "STACK Infrastructure", "cc": "JP", "city": "Tokyo", "lat": 35.75, "lon": 139.6, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "EdgeConneX Greater Osaka–Kyoto", "op": "EdgeConneX · Kagoya", "cc": "JP", "city": "Greater Osaka", "lat": 34.75, "lon": 135.77, "type": "C", "st": "P", "mw": 200, "basis": "i", "ai": false, "note": "200+ MW at full build", "src": [["https://www.blackridgeresearch.com/blog/latest-list-top-largest-data-center-projects-japan", "Blackridge Research — Largest data center projects in Japan"]], "checked": "2026-11-21"},
  {"name": "Akita AI data center", "op": "(consortium)", "cc": "JP", "city": "Akita", "lat": 39.72, "lon": 140.1, "type": "A", "st": "P", "mw": 500, "basis": "g", "ai": true, "note": "300–500 MW concept, ~$12.6B est.", "src": [["https://www.techrepublic.com/article/news-apac-japan-akita-ai-data-center/", "TechRepublic — Akita AI data center ($12.6B)"]], "checked": "2026-11-21"},
  {"name": "CyrusOne / KEPCO Osaka", "op": "CyrusOne · Kansai Electric", "cc": "JP", "city": "Osaka", "lat": 34.66, "lon": 135.43, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Vantage Osaka", "op": "Vantage Data Centers", "cc": "JP", "city": "Osaka", "lat": 34.62, "lon": 135.48, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Highreso Kagawa GPU DC", "op": "Highreso", "cc": "JP", "city": "Kagawa", "lat": 34.34, "lon": 134.05, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "NTT Kyoto Keihanna", "op": "NTT DATA", "cc": "JP", "city": "Keihanna, Kyoto", "lat": 34.76, "lon": 135.78, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Osaka OS3", "op": "Equinix", "cc": "JP", "city": "Osaka", "lat": 34.68, "lon": 135.52, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "SK–AWS Ulsan AI DC", "op": "SK Group · AWS", "cc": "KR", "city": "Ulsan", "lat": 35.54, "lon": 129.31, "type": "A", "st": "U", "mw": 1000, "basis": "g", "ai": true, "note": "103 MW first phase (~60k GPUs) from 2027; target raised to 1 GW (Nov 2025)", "src": [["https://www.datacenterdynamics.com/en/news/sk-telecom-plans-tenfold-expansion-for-data-center-in-ulsan-south-korea-plans-to-build-facility-in-vietnam/", "DCD — SK Telecom tenfold Ulsan expansion"], ["https://www.koreatimes.co.kr/business/tech-science/20250829/sk-aws-break-ground-for-ai-data-center-in-ulsan", "Korea Times — Groundbreaking"]], "checked": "2026-11-21"},
  {"name": "Solaseado AI DC (Jeonnam)", "op": "SK Telecom · OpenAI (MOU)", "cc": "KR", "city": "Haenam, Jeonnam", "lat": 34.57, "lon": 126.6, "type": "A", "st": "P", "mw": null, "basis": "g", "ai": true, "note": ""},
  {"name": "Naver Gak Sejong", "op": "Naver Cloud", "cc": "KR", "city": "Sejong", "lat": 36.48, "lon": 127.29, "type": "H", "st": "O", "mw": 270, "basis": "i", "ai": true, "note": "270 MW at full build; NVIDIA expansion 100 MW by 2027, 200 MW by 2028", "src": [["https://www.datacenterdynamics.com/en/news/south-koreas-naver-confirms-it-will-expand-sejong-data-center-to-200mw/", "DCD — Naver Sejong expansion"]], "checked": "2026-11-21"},
  {"name": "Naver Gak Chuncheon", "op": "Naver Cloud", "cc": "KR", "city": "Chuncheon", "lat": 37.88, "lon": 127.73, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "KT Cloud Gasan", "op": "KT Cloud", "cc": "KR", "city": "Seoul", "lat": 37.48, "lon": 126.88, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "LG U+ Pyeongchon", "op": "LG Uplus", "cc": "KR", "city": "Anyang", "lat": 37.39, "lon": 126.96, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "SK Broadband Gasan", "op": "SK Broadband", "cc": "KR", "city": "Seoul", "lat": 37.47, "lon": 126.89, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Kakao Ansan", "op": "Kakao", "cc": "KR", "city": "Ansan", "lat": 37.32, "lon": 126.83, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NHN National AI DC", "op": "NHN Cloud", "cc": "KR", "city": "Gwangju", "lat": 35.16, "lon": 126.85, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Equinix Seoul (SL1/SL4)", "op": "Equinix", "cc": "KR", "city": "Seoul", "lat": 37.57, "lon": 126.98, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Edge SEL2", "op": "Digital Edge", "cc": "KR", "city": "Incheon", "lat": 37.46, "lon": 126.7, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "STACK ICN", "op": "STACK Infrastructure", "cc": "KR", "city": "Incheon", "lat": 37.45, "lon": 126.65, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Samsung SDS Dongtan", "op": "Samsung SDS", "cc": "KR", "city": "Hwaseong", "lat": 37.2, "lon": 127.07, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Microsoft Korea Central", "op": "Microsoft", "cc": "KR", "city": "Seoul", "lat": 37.55, "lon": 127.0, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Seoul region", "op": "Amazon (AWS)", "cc": "KR", "city": "Seoul metro", "lat": 37.5, "lon": 127.05, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Foxconn / NVIDIA AI factory", "op": "Foxconn · NVIDIA", "cc": "TW", "city": "Kaohsiung", "lat": 22.63, "lon": 120.3, "type": "A", "st": "O", "mw": 100, "basis": "g", "ai": true, "note": "Phased: 20 MW → 100 MW; US$1.4B GB200 cluster ready H1 2026", "src": [["https://www.aol.com/articles/foxconn-1-000-ai-racks-031831075.html", "Reuters via AOL — Foxconn-Nvidia cluster ready H1 2026"], ["https://www.asiae.co.kr/en/article/2025052016035219040", "Asia Economy — Foxconn 100 MW AI data center"]], "checked": "2026-11-21"},
  {"name": "Google Changhua", "op": "Google", "cc": "TW", "city": "Changhua", "lat": 24.08, "lon": 120.54, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Chief Telecom LY2", "op": "Chief Telecom", "cc": "TW", "city": "Taipei", "lat": 25.06, "lon": 121.58, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Chunghwa Telecom Banqiao IDC", "op": "Chunghwa Telecom", "cc": "TW", "city": "New Taipei", "lat": 25.01, "lon": 121.46, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Taipei region", "op": "Amazon (AWS)", "cc": "TW", "city": "Taipei metro", "lat": 25.03, "lon": 121.56, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Edge TPE1", "op": "Digital Edge", "cc": "TW", "city": "Taipei", "lat": 25.05, "lon": 121.52, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "China Telecom Inner Mongolia Info Park", "op": "China Telecom", "cc": "CN", "city": "Hohhot", "lat": 40.84, "lon": 111.75, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "China Mobile Hohhot DC", "op": "China Mobile", "cc": "CN", "city": "Hohhot", "lat": 40.8, "lon": 111.66, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "China Unicom Hohhot DC", "op": "China Unicom", "cc": "CN", "city": "Hohhot", "lat": 40.82, "lon": 111.7, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Alibaba Zhangbei", "op": "Alibaba Cloud", "cc": "CN", "city": "Zhangbei, Hebei", "lat": 41.15, "lon": 114.71, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Alibaba Ulanqab", "op": "Alibaba Cloud", "cc": "CN", "city": "Ulanqab", "lat": 41.0, "lon": 113.13, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Tencent Gui'an", "op": "Tencent", "cc": "CN", "city": "Gui'an, Guizhou", "lat": 26.4, "lon": 106.5, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Cave-built facility"},
  {"name": "Huawei Cloud Gui'an", "op": "Huawei Cloud", "cc": "CN", "city": "Gui'an, Guizhou", "lat": 26.42, "lon": 106.45, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "GCBD (Apple iCloud China)", "op": "Guizhou-Cloud Big Data", "cc": "CN", "city": "Gui'an, Guizhou", "lat": 26.38, "lon": 106.55, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "ByteDance Ulanqab", "op": "ByteDance", "cc": "CN", "city": "Ulanqab", "lat": 40.98, "lon": 113.1, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Baidu Yangquan", "op": "Baidu", "cc": "CN", "city": "Yangquan, Shanxi", "lat": 37.86, "lon": 113.58, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Chindata Huailai", "op": "Chindata", "cc": "CN", "city": "Huailai, Hebei", "lat": 40.42, "lon": 115.52, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "GDS Shanghai campus", "op": "GDS", "cc": "CN", "city": "Shanghai", "lat": 31.23, "lon": 121.47, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NWCD Zhongwei (AWS Ningxia)", "op": "NWCD", "cc": "CN", "city": "Zhongwei, Ningxia", "lat": 37.51, "lon": 105.19, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "China Mobile Qingyang hub", "op": "China Mobile", "cc": "CN", "city": "Qingyang, Gansu", "lat": 35.71, "lon": 107.64, "type": "T", "st": "U", "mw": null, "basis": "i", "ai": true, "note": "East Data West Computing node"},
  {"name": "Shanghai Lingang compute hub", "op": "(various)", "cc": "CN", "city": "Lingang, Shanghai", "lat": 30.9, "lon": 121.92, "type": "T", "st": "U", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Equinix Hong Kong campus", "op": "Equinix", "cc": "HK", "city": "Tsuen Wan", "lat": 22.37, "lon": 114.11, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "SUNeVision MEGA Plus", "op": "SUNeVision", "cc": "HK", "city": "Tseung Kwan O", "lat": 22.31, "lon": 114.26, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix Singapore campus", "op": "Equinix", "cc": "SG", "city": "Singapore", "lat": 1.33, "lon": 103.89, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "SG6 opened 2026 (8 MW → 20 MW); +50 MW provisional DC-CFA2 award", "src": [["https://www.crnasia.com/news/2026/data-center/equinix-opens-ai-data-center-in-singapore", "CRN Asia — Equinix SG6"], ["https://www.edb.gov.sg/content/dam/edb-en/about-edb/media-releases/news/four-data-centre-proposals-selected-as-part-of-second-data-centre/Fact%20Sheet%20-Four%20data%20centre%20proposals%20selected%20as%20part%20of%20second%20data%20centre.pdf", "EDB — DC-CFA2 fact sheet"]], "checked": "2026-11-21"},
  {"name": "Digital Realty SIN11", "op": "Digital Realty", "cc": "SG", "city": "Loyang", "lat": 1.37, "lon": 103.97, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Jurong West", "op": "Google", "cc": "SG", "city": "Jurong West", "lat": 1.34, "lon": 103.7, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Meta Tanjong Kling", "op": "Meta", "cc": "SG", "city": "Tanjong Kling", "lat": 1.3, "lon": 103.7, "type": "H", "st": "O", "mw": 150, "basis": "g", "ai": false, "note": "11-storey; Meta's first own-design DC in Asia", "src": [["https://www.datacenterknowledge.com/hyperscalers/facebook-to-build-the-largest-hyperscale-data-center-singapore-has-ever-seen", "Data Center Knowledge — Meta Singapore 150 MW"]], "checked": "2026-11-21"},
  {"name": "Microsoft Southeast Asia", "op": "Microsoft", "cc": "SG", "city": "Singapore", "lat": 1.35, "lon": 103.82, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Singapore region", "op": "Amazon (AWS)", "cc": "SG", "city": "Singapore", "lat": 1.32, "lon": 103.8, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "STT GDC Singapore", "op": "ST Telemedia GDC", "cc": "SG", "city": "Singapore", "lat": 1.31, "lon": 103.86, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Keppel DC Singapore", "op": "Keppel DC", "cc": "SG", "city": "Singapore", "lat": 1.34, "lon": 103.95, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Princeton Digital SG1", "op": "Princeton Digital Group", "cc": "SG", "city": "Singapore", "lat": 1.36, "lon": 103.89, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AirTrunk SGP1", "op": "AirTrunk (Blackstone)", "cc": "SG", "city": "Singapore", "lat": 1.32, "lon": 103.74, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Singtel DC Tuas", "op": "Singtel (Nxera)", "cc": "SG", "city": "Tuas", "lat": 1.3, "lon": 103.64, "type": "T", "st": "O", "mw": 58, "basis": "i", "ai": true, "note": "58 MW, Singapore's highest-density DC; >90% pre-committed", "src": [["https://www.jtc.gov.sg/about-jtc/news-and-stories/industry-news/nxera-opens-multi-tenanted-data-centre", "JTC / Singtel — Nxera opens DC Tuas"]], "checked": "2026-11-21"},
  {"name": "Global Switch Singapore", "op": "Global Switch", "cc": "SG", "city": "Tai Seng", "lat": 1.34, "lon": 103.89, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "YTL Green Data Center Park", "op": "YTL · NVIDIA", "cc": "MY", "city": "Kulai, Johor", "lat": 1.66, "lon": 103.6, "type": "A", "st": "O", "mw": 1200, "basis": "g", "ai": true, "note": "NVIDIA GB200 cluster live Oct 2025; park plan doubled from 600 MW to 1.2 GW (Jun 2026)", "src": [["https://www.nst.com.my/amp/business/corporate/2026/06/1472220/ytl-power-speeds-data-centre-expansion-kulai-campus-doubles-12gw", "NST — Kulai campus doubles to 1.2 GW (Jun 2026)"], ["https://epoch.ai/data/ai-data-centers/directory/ytl-johor", "Epoch AI — YTL Johor"]], "checked": "2026-11-21", "now_it": 100},
  {"name": "AirTrunk JHB1", "op": "AirTrunk (Blackstone)", "cc": "MY", "city": "Johor", "lat": 1.5, "lon": 103.7, "type": "C", "st": "O", "mw": 150, "basis": "i", "ai": false, "note": "150 MW; opened 2024", "src": [["https://www.mingtiandi.com/real-estate/data-centres/airtrunk-enters-malaysia-with-johor-bahru-data-centre/", "Mingtiandi — AirTrunk 150 MW JHB1"]], "checked": "2026-11-21"},
  {"name": "Microsoft Malaysia West", "op": "Microsoft", "cc": "MY", "city": "Kuala Lumpur", "lat": 3.14, "lon": 101.69, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Elmina", "op": "Google", "cc": "MY", "city": "Shah Alam, Selangor", "lat": 3.17, "lon": 101.5, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Malaysia region", "op": "Amazon (AWS)", "cc": "MY", "city": "Kuala Lumpur", "lat": 3.1, "lon": 101.65, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Princeton Digital JH1", "op": "Princeton Digital Group", "cc": "MY", "city": "Johor", "lat": 1.53, "lon": 103.65, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Bridge DC Johor", "op": "Bridge Data Centres", "cc": "MY", "city": "Johor", "lat": 1.48, "lon": 103.62, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "DayOne Nusajaya", "op": "DayOne", "cc": "MY", "city": "Iskandar Puteri, Johor", "lat": 1.43, "lon": 103.65, "type": "C", "st": "O", "mw": 473, "basis": "i", "ai": true, "note": "Epoch est. ~473 MW IT", "src": [["https://epoch.ai/data/data-centers?tab=power&view=graph", "Epoch AI — Data centers by power"]], "checked": "2026-11-21", "now_it": 473},
  {"name": "Yondr Johor", "op": "Yondr", "cc": "MY", "city": "Johor", "lat": 1.55, "lon": 103.75, "type": "C", "st": "U", "mw": 300, "basis": "i", "ai": false, "note": ""},
  {"name": "NTT Cyberjaya", "op": "NTT DATA", "cc": "MY", "city": "Cyberjaya", "lat": 2.92, "lon": 101.65, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Vantage KUL1", "op": "Vantage Data Centers", "cc": "MY", "city": "Cyberjaya", "lat": 2.93, "lon": 101.66, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix JH1", "op": "Equinix", "cc": "MY", "city": "Johor", "lat": 1.47, "lon": 103.76, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Nongsa Digital Park", "op": "(various)", "cc": "ID", "city": "Batam", "lat": 1.2, "lon": 104.1, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "DCI Cibitung campus", "op": "DCI Indonesia", "cc": "ID", "city": "Bekasi", "lat": -6.27, "lon": 107.08, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix JK1", "op": "Equinix", "cc": "ID", "city": "Jakarta", "lat": -6.21, "lon": 106.85, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Edge EDGE2", "op": "Digital Edge", "cc": "ID", "city": "Jakarta", "lat": -6.18, "lon": 106.82, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "BDx Jakarta", "op": "BDx", "cc": "ID", "city": "Jakarta", "lat": -6.25, "lon": 106.8, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NeutraDC Batam", "op": "NeutraDC (Telkom)", "cc": "ID", "city": "Batam", "lat": 1.1, "lon": 104.03, "type": "T", "st": "U", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Google Jakarta region", "op": "Google", "cc": "ID", "city": "Jakarta", "lat": -6.3, "lon": 106.9, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Thailand region", "op": "Amazon (AWS)", "cc": "TH", "city": "Bangkok metro", "lat": 13.75, "lon": 100.5, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Thailand (Chonburi)", "op": "Google", "cc": "TH", "city": "Chonburi", "lat": 13.36, "lon": 100.98, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Thailand", "op": "Microsoft", "cc": "TH", "city": "Bangkok", "lat": 13.7, "lon": 100.55, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "STT GDC Bangkok", "op": "ST Telemedia GDC", "cc": "TH", "city": "Bangkok", "lat": 13.72, "lon": 100.6, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Siam AI / True IDC", "op": "True IDC · Siam AI", "cc": "TH", "city": "Bangkok", "lat": 13.78, "lon": 100.55, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "Viettel Tân Phú Trung", "op": "Viettel IDC", "cc": "VN", "city": "Ho Chi Minh City", "lat": 10.95, "lon": 106.55, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "VNPT Hòa Lạc", "op": "VNPT", "cc": "VN", "city": "Hanoi", "lat": 21.01, "lon": 105.52, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "FPT Hanoi AI factory", "op": "FPT", "cc": "VN", "city": "Hanoi", "lat": 21.03, "lon": 105.78, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "NVIDIA H100/H200 cloud"},
  {"name": "ST Telemedia Manila", "op": "ST Telemedia GDC", "cc": "PH", "city": "Manila", "lat": 14.55, "lon": 121.03, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Visakhapatnam AI hub", "op": "Google · AdaniConneX · Airtel", "cc": "IN", "city": "Visakhapatnam, AP", "lat": 17.69, "lon": 83.22, "type": "H", "st": "U", "mw": 1000, "basis": "g", "ai": true, "note": "$15B 2026–30; ground broken Apr 2026", "src": [["https://www.googlecloudpresscorner.com/2025-10-14-Google-Announces-First-AI-Hub-in-India%2C-Bringing-Companys-Full-AI-Stack-and-Consumer-Services-to-Country", "Google — First AI hub in India"], ["https://yourstory.com/2026/04/google-breaks-ground-on-ai-hub-in-visakhapatnam", "YourStory — Google breaks ground (Apr 2026)"]], "checked": "2026-11-21"},
  {"name": "Reliance Jamnagar AI campus", "op": "Reliance Industries", "cc": "IN", "city": "Jamnagar, Gujarat", "lat": 22.47, "lon": 70.06, "type": "A", "st": "U", "mw": 1000, "basis": "g", "ai": true, "note": "Gigawatt-scale AI campus; Meta 168 MW pact (Jun 2026)", "src": [["https://www.outlookbusiness.com/start-up/deeptech/after-google-reliance-plans-to-set-up-1-gw-ai-data-centre-in-andhra-pradesh", "Outlook Business — Reliance gigawatt campuses"]], "checked": "2026-11-21"},
  {"name": "Reliance / Brookfield / Digital Realty Vizag", "op": "Digital Connexion", "cc": "IN", "city": "Visakhapatnam, AP", "lat": 17.75, "lon": 83.3, "type": "C", "st": "P", "mw": 1000, "basis": "g", "ai": true, "note": "$11B, 400 acres", "src": [["https://www.verdict.co.uk/reliance-ai-data-centre-visakhapatnam-india/", "Verdict — Reliance AI data centre, Visakhapatnam"]], "checked": "2026-11-21"},
  {"name": "AdaniConneX Taloja (Navi Mumbai)", "op": "AdaniConneX", "cc": "IN", "city": "Navi Mumbai", "lat": 19.03, "lon": 73.03, "type": "C", "st": "U", "mw": 500, "basis": "g", "ai": true, "note": "500 MW proposed; CoreWeave 240 MW (3×80 MW, Vera Rubin) from mid-2028", "src": [["https://inc42.com/?p=575101", "Inc42 — CoreWeave 240 MW at Taloja"], ["https://www.datacentermap.com/india/navi-mumbai/adaniconnex-taloja-campus/", "Data Center Map — AdaniConneX Taloja"]], "checked": "2026-11-21"},
  {"name": "Yotta NM1", "op": "Yotta", "cc": "IN", "city": "Panvel, Navi Mumbai", "lat": 18.99, "lon": 73.12, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": "Shakti Cloud GPUs"},
  {"name": "Yotta D1", "op": "Yotta", "cc": "IN", "city": "Greater Noida", "lat": 28.47, "lon": 77.5, "type": "A", "st": "O", "mw": null, "basis": "i", "ai": true, "note": ""},
  {"name": "CtrlS Hyderabad campus", "op": "CtrlS", "cc": "IN", "city": "Hyderabad", "lat": 17.45, "lon": 78.38, "type": "C", "st": "O", "mw": 500, "basis": "g", "ai": true, "note": "AI mega campus planned up to 500 MW", "src": [["https://www.rcrwireless.com/20250425/ai-ml/top-five-ai-data-center-india", "RCR Wireless — Top AI data center projects in India"]], "checked": "2026-11-21"},
  {"name": "NTT Mumbai campus", "op": "NTT DATA", "cc": "IN", "city": "Mumbai", "lat": 19.12, "lon": 72.86, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "STT GDC India Mumbai", "op": "ST Telemedia GDC", "cc": "IN", "city": "Mumbai", "lat": 19.07, "lon": 72.88, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Sify Rabale", "op": "Sify", "cc": "IN", "city": "Navi Mumbai", "lat": 19.14, "lon": 73.0, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Nxtra Chennai", "op": "Nxtra (Airtel)", "cc": "IN", "city": "Chennai", "lat": 13.08, "lon": 80.27, "type": "T", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Hyderabad", "op": "Microsoft", "cc": "IN", "city": "Hyderabad", "lat": 17.38, "lon": 78.48, "type": "H", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Hyderabad region", "op": "Amazon (AWS)", "cc": "IN", "city": "Hyderabad", "lat": 17.4, "lon": 78.5, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Mumbai region", "op": "Amazon (AWS)", "cc": "IN", "city": "Mumbai", "lat": 19.1, "lon": 72.9, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Equinix MB3", "op": "Equinix", "cc": "IN", "city": "Mumbai", "lat": 19.05, "lon": 72.9, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Princeton Digital Mumbai", "op": "Princeton Digital Group", "cc": "IN", "city": "Navi Mumbai", "lat": 19.06, "lon": 73.02, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Digital Edge BOM1", "op": "Digital Edge", "cc": "IN", "city": "Navi Mumbai", "lat": 19.08, "lon": 73.01, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Colt DCS Mumbai", "op": "Colt DCS", "cc": "IN", "city": "Mumbai", "lat": 19.13, "lon": 72.92, "type": "C", "st": "U", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AirTrunk SYD1", "op": "AirTrunk (Blackstone)", "cc": "AU", "city": "Western Sydney", "lat": -33.8, "lon": 150.9, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AirTrunk MEL2", "op": "AirTrunk (Blackstone)", "cc": "AU", "city": "Melbourne", "lat": -37.76, "lon": 144.8, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "NEXTDC S4 Horsley Park", "op": "NEXTDC", "cc": "AU", "city": "Sydney", "lat": -33.84, "lon": 150.85, "type": "C", "st": "P", "mw": 300, "basis": "i", "ai": true, "note": "300 MW target IT", "src": [["https://www.nextdc.com/hyperscale-map", "NEXTDC — Hyperscale map"]], "checked": "2026-11-21"},
  {"name": "NEXTDC M3", "op": "NEXTDC", "cc": "AU", "city": "Melbourne", "lat": -37.8, "lon": 144.89, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CDC Eastern Creek", "op": "CDC Data Centres", "cc": "AU", "city": "Sydney", "lat": -33.8, "lon": 150.85, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "CDC Canberra (Hume / Fyshwick)", "op": "CDC Data Centres", "cc": "AU", "city": "Canberra", "lat": -35.39, "lon": 149.17, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": "Government-grade"},
  {"name": "Equinix Sydney campus", "op": "Equinix", "cc": "AU", "city": "Sydney", "lat": -33.92, "lon": 151.19, "type": "C", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Microsoft Australia East", "op": "Microsoft", "cc": "AU", "city": "Sydney", "lat": -33.87, "lon": 151.1, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "AWS Sydney region", "op": "Amazon (AWS)", "cc": "AU", "city": "Sydney", "lat": -33.85, "lon": 151.0, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Google Melbourne region", "op": "Google", "cc": "AU", "city": "Melbourne", "lat": -37.81, "lon": 144.96, "type": "H", "st": "O", "mw": null, "basis": "i", "ai": false, "note": ""},
  {"name": "Firmus / CDC Project Southgate", "op": "Firmus", "cc": "AU", "city": "Tasmania", "lat": -41.44, "lon": 147.14, "type": "A", "st": "U", "mw": null, "basis": "g", "ai": true, "note": "Hydro-backed AI factory"},
  {"name": "DataGrid Southland campus", "op": "DataGrid", "cc": "NZ", "city": "Southland", "lat": -46.41, "lon": 168.35, "type": "A", "st": "P", "mw": null, "basis": "g", "ai": true, "note": ""}
 ]
}
