# AirTrunk TOK1

- Operator: AirTrunk (Blackstone)
- Location: Inzai, Chiba, Japan (Asia Pacific)
- Coordinates (approx.): 35.83, 140.15
- Type: Colocation (AI-focused)
- Status: Operating
- Reported capacity: 300 MW (IT / critical load)
- Estimated grid power: 420 MW; IT load: 300 MW (PUE 1.40)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~180k
- Notes: 300+ MW campus; opened 2021 with ~60 MW; US$1B liquid-cooling upgrade
- Last checked: 2026-11-21

## Sources

- [AirTrunk — TOK1 Tokyo East](https://airtrunk.com/?p=6399)
- [Spherical Insights — AirTrunk US$1B TOK1 upgrade](https://www.sphericalinsights.com/blogs/airtrunk-commits-us-1-billion-to-upgrade-japan-data-centre-for-ai-workloads)

Canonical page: https://atlas.kehai.co/f/airtrunk-tok1/ · Dataset: https://atlas.kehai.co/data.json
