# Akita AI data center

- Operator: (consortium)
- Location: Akita, Japan (Asia Pacific)
- Coordinates (approx.): 39.72, 140.1
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 500 MW (grid / total power)
- Estimated grid power: 500 MW; IT load: 400 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~240k
- Notes: 300–500 MW concept, ~$12.6B est.
- Last checked: 2026-11-21

## Sources

- [TechRepublic — Akita AI data center ($12.6B)](https://www.techrepublic.com/article/news-apac-japan-akita-ai-data-center/)

Canonical page: https://atlas.kehai.co/f/akita-ai-data-center/ · Dataset: https://atlas.kehai.co/data.json
