# Applied Digital Delta Forge 1

- Operator: Applied Digital
- Location: Boyce, LA, United States (North America)
- Coordinates (approx.): 31.39, -92.67
- Type: AI campus (AI-focused)
- Status: Under construction
- Reported capacity: 430 MW (grid / total power)
- Estimated grid power: 430 MW; IT load: 344 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~206k
- Last checked: 2026-11-21

## Sources

- [US Data Center Map: 2026 Project Tracker](https://www.apollotechnical.com/?p=58960)

Canonical page: https://atlas.kehai.co/f/applied-digital-delta-forge-1/ · Dataset: https://atlas.kehai.co/data.json