# Applied Digital Delta Forge 2

- Operator: Applied Digital
- Location: Brookwood, AL, United States (North America)
- Coordinates (approx.): 33.26, -87.32
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 210 MW (IT / critical load)
- Estimated grid power: 262 MW; IT load: 210 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~126k
- Notes: $3.2B, 210 MW critical IT
- Last checked: 2026-11-21