# Applied Digital Polaris Forge 2

- Operator: Applied Digital
- Location: Harwood, ND, United States (North America)
- Coordinates (approx.): 46.98, -96.9
- Type: AI campus (AI-focused)
- Status: Under construction
- Reported capacity: 280 MW (IT / critical load)
- Estimated grid power: 350 MW; IT load: 280 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~168k
- Notes: 280 MW campus; 200 MW leased to a hyperscaler, ROFR on 800 MW more; PUE 1.18 target
- Last checked: 2026-11-21