# CloudBurst Central Texas

- Operator: CloudBurst Data Centers
- Location: San Marcos, TX, United States (North America)
- Coordinates (approx.): 29.88, -97.94
- Type: AI campus (AI-focused)
- Status: Under construction
- Reported capacity: 1,200 MW (grid / total power)
- Estimated grid power: 1.20 GW; IT load: 960 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~576k
- Notes: Three 400 MW phases
- Last checked: 2026-11-21

## Sources

- [US Data Center Map: 2026 Project Tracker](https://www.apollotechnical.com/?p=58960)

Canonical page: https://atlas.kehai.co/f/cloudburst-central-texas/ · Dataset: https://atlas.kehai.co/data.json
