# Cologix Johnstown campus

- Operator: Cologix
- Location: Johnstown, OH, United States (North America)
- Coordinates (approx.): 40.15, -82.69
- Type: Colocation
- Status: Under construction
- Reported capacity: 800 MW (grid / total power)
- Estimated grid power: 800 MW; IT load: 571 MW (PUE 1.40)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~343k
- Notes: Eight data centers, ~$7B
- Last checked: 2026-11-21