# Colossus 1

- Operator: SpaceXAI (xAI)
- Location: Memphis, TN, United States (North America)
- Coordinates (approx.): 35.06, -90.15
- Type: AI campus (AI-focused)
- Status: Operating
- Reported capacity: 300 MW (grid / total power)
- Estimated grid power: 300 MW; IT load: 240 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~144k
- Notes: Converted Electrolux plant; built in 122 days
- Last checked: 2026-11-21

## Sources

- [Data Center Frontier — xAI's AI factories](https://www.datacenterfrontier.com/machine-learning/article/55343403/xais-ai-factories-from-colossus-to-macrohardrr-in-the-gigawatt-era)

Canonical page: https://atlas.kehai.co/f/colossus-1/ · Dataset: https://atlas.kehai.co/data.json