# DayOne Nusajaya

- Operator: DayOne
- Location: Iskandar Puteri, Johor, Malaysia (Asia Pacific)
- Coordinates (approx.): 1.43, 103.65
- Type: Colocation (AI-focused)
- Status: Operating
- Reported capacity: 473 MW (IT / critical load)
- Estimated grid power: 662 MW; IT load: 473 MW (PUE 1.40)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~284k
- Live IT load today (estimate): 473 MW
- Notes: Epoch est. ~473 MW IT
- Last checked: 2026-11-21

## Sources

- [Epoch AI — Data centers by power](https://epoch.ai/data/data-centers?tab=power&view=graph)

Canonical page: https://atlas.kehai.co/f/dayone-nusajaya/ · Dataset: https://atlas.kehai.co/data.json
