# Fermi America Project Matador

- Operator: Fermi America
- Location: Amarillo, TX, United States (North America)
- Coordinates (approx.): 35.3, -101.6
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 11,000 MW (grid / total power)
- Estimated grid power: 11.0 GW; IT load: 8.80 GW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~5.28M
- Notes: $300B private-grid concept; initial 1 GW phase targeted first
- Last checked: 2026-11-21

## Sources

- [ENR — Fermi America 11 GW campus](https://www.enr.com/articles/61083-power-hungry-ai-fueled-data-center-boom-sets-energy-deliverys-new-course)

Canonical page: https://atlas.kehai.co/f/fermi-america-project-matador/ · Dataset: https://atlas.kehai.co/data.json
