# Galaxy Helios

- Operator: Galaxy Digital · CoreWeave
- Location: Dickens County, TX, United States (North America)
- Coordinates (approx.): 33.62, -100.84
- Type: AI campus (AI-focused)
- Status: Operating
- Reported capacity: 800 MW (grid / total power)
- Estimated grid power: 800 MW; IT load: 640 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~384k
- Live IT load today (estimate): 133 MW
- Notes: 800 MW gross = 526 MW critical IT for CoreWeave; phase I (133 MW IT) delivered; 1.63 GW site
- Last checked: 2026-11-21

## Sources

- [The Block — Galaxy delivers 133 MW to CoreWeave](https://www.theblock.co/post/407396/galaxy-delivers-133-mw-of-critical-it-load-to-coreweave-as-helios-bitcoin-mine-turns-ai-hub)
- [Data Center Knowledge — Galaxy's 1.63 GW Helios](https://www.datacenterknowledge.com/data-center-construction/galaxy-bets-its-data-center-edge-on-power-not-bragawatts-)

Canonical page: https://atlas.kehai.co/f/galaxy-helios/ · Dataset: https://atlas.kehai.co/data.json