# Goodman Tsukuba (TY005)

- Operator: Goodman Group
- Location: Tsukuba, Ibaraki, Japan (Asia Pacific)
- Coordinates (approx.): 36.08, 140.11
- Type: Colocation (AI-focused)
- Status: Under construction
- Reported capacity: 1,000 MW (grid / total power)
- Estimated grid power: 1.00 GW; IT load: 714 MW (PUE 1.40)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~429k
- Notes: Up to 1 GW at full build-out
- Last checked: 2026-11-21

## Sources

- [Blackridge Research — Largest data center projects in Japan](https://www.blackridgeresearch.com/blog/latest-list-top-largest-data-center-projects-japan)

Canonical page: https://atlas.kehai.co/f/goodman-tsukuba-ty005/ · Dataset: https://atlas.kehai.co/data.json
