# Google New Albany

- Operator: Google
- Location: New Albany, OH, United States (North America)
- Coordinates (approx.): 40.09, -82.8
- Type: Hyperscaler (AI-focused)
- Status: Operating
- Reported capacity: 453 MW (IT / critical load)
- Estimated grid power: 544 MW; IT load: 453 MW (PUE 1.20)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~272k
- Live IT load today (estimate): 453 MW
- Notes: Central Ohio TPU cluster; Epoch est. ~453 MW IT
- Last checked: 2026-11-21

## Sources

- [Epoch AI — AI data centers hub](https://epoch.ai/data/ai-data-centers?tab=cost)

Canonical page: https://atlas.kehai.co/f/google-new-albany/ · Dataset: https://atlas.kehai.co/data.json
