# Meta Prometheus

- Operator: Meta
- Location: New Albany, OH, United States (North America)
- Coordinates (approx.): 40.08, -82.78
- Type: Hyperscaler (AI-focused)
- Status: Operating
- Reported capacity: 1,000 MW (grid / total power)
- Estimated grid power: 1.00 GW; IT load: 833 MW (PUE 1.20)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~500k
- Live IT load today (estimate): 471 MW
- Notes: 1 GW 'titan' cluster; Epoch est. 471 MW IT live, ~1,022 MW IT projected
- Last checked: 2026-11-21

## Sources

- [Epoch AI — Meta Prometheus](https://epoch.ai/data/ai-data-centers/directory/meta-prometheus)
- [GamesBeat — How Meta built a 1 GW data center](https://gamesbeat.com/how-meta-built-a-1gw-data-center-in-ohio-and-is-planning-for-a-5gw-data-center-in-louisiana/)