# Microsoft Fairwater Atlanta

- Operator: Microsoft
- Location: Fayetteville, GA, United States (North America)
- Coordinates (approx.): 33.45, -84.46
- Type: Hyperscaler (AI-focused)
- Status: Operating
- Reported capacity: 636 MW (IT / critical load)
- Estimated grid power: 763 MW; IT load: 636 MW (PUE 1.20)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~382k
- Live IT load today (estimate): 636 MW
- Notes: Built by QTS; Epoch est. 636 MW IT, GB200; Fairwater site #2 (Oct 2025)
- Last checked: 2026-11-21