# Microsoft Rhineland (Bergheim / Elsdorf)

- Operator: Microsoft
- Location: Bergheim, NRW, Germany (Europe)
- Coordinates (approx.): 50.96, 6.64
- Type: Hyperscaler
- Status: Under construction
- Reported capacity: 500 MW (grid / total power)
- Estimated grid power: 500 MW; IT load: 417 MW (PUE 1.20)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~250k
- Notes: €3.2B, three sites; ~520 MVA grid connection; ground broken 2026
- Last checked: 2026-11-21

## Sources

- [heise — Microsoft NRW cluster 520 MW](https://heise.de/-11216864)
- [GTAI — Groundbreaking (Apr 2026)](https://www.gtai.de/en/invest/industries/digital-economy/groundbreaking-ceremony-at-microsoft-s-nrw-data-center--1990680)

Canonical page: https://atlas.kehai.co/f/microsoft-rhineland-bergheim-elsdorf/ · Dataset: https://atlas.kehai.co/data.json