# Mistral Compute

- Operator: Mistral AI · Fluidstack · Eclairion
- Location: Bruyères-le-Châtel, Essonne, France (Europe)
- Coordinates (approx.): 48.59, 2.19
- Type: AI campus (AI-focused)
- Status: Operating
- Reported capacity: 40 MW (IT / critical load)
- Estimated grid power: 50 MW; IT load: 40 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~24k
- Notes: 40 MW Eclairion site, expandable to 100 MW+; 18k Grace Blackwell
- Last checked: 2026-11-21