# Naver Gak Sejong

- Operator: Naver Cloud
- Location: Sejong, South Korea (Asia Pacific)
- Coordinates (approx.): 36.48, 127.29
- Type: Hyperscaler (AI-focused)
- Status: Operating
- Reported capacity: 270 MW (IT / critical load)
- Estimated grid power: 324 MW; IT load: 270 MW (PUE 1.20)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~162k
- Notes: 270 MW at full build; NVIDIA expansion 100 MW by 2027, 200 MW by 2028
- Last checked: 2026-11-21

## Sources

- [DCD — Naver Sejong expansion](https://www.datacenterdynamics.com/en/news/south-koreas-naver-confirms-it-will-expand-sejong-data-center-to-200mw/)

Canonical page: https://atlas.kehai.co/f/naver-gak-sejong/ · Dataset: https://atlas.kehai.co/data.json
