# Nebius Independence campus

- Operator: Nebius
- Location: Independence, MO, United States (North America)
- Coordinates (approx.): 39.03, -94.36
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 800 MW (grid / total power)
- Estimated grid power: 800 MW; IT load: 640 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~384k
- Notes: Announced Jan 2026: 400-acre site, 800 MW planned (up to 1.2 GW)
- Last checked: 2026-11-21