# NEXTDC S4 Horsley Park

- Operator: NEXTDC
- Location: Sydney, Australia (Asia Pacific)
- Coordinates (approx.): -33.84, 150.85
- Type: Colocation (AI-focused)
- Status: Planned
- Reported capacity: 300 MW (IT / critical load)
- Estimated grid power: 420 MW; IT load: 300 MW (PUE 1.40)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~180k
- Notes: 300 MW target IT
- Last checked: 2026-11-21

## Sources

- [NEXTDC — Hyperscale map](https://www.nextdc.com/hyperscale-map)

Canonical page: https://atlas.kehai.co/f/nextdc-s4-horsley-park/ · Dataset: https://atlas.kehai.co/data.json
