# Project Jade (Cheyenne)

- Operator: Black Hills Energy · Tallgrass · undisclosed tenant
- Location: Laramie County, WY, United States (North America)
- Coordinates (approx.): 41.07, -104.82
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 1,800 MW (grid / total power)
- Estimated grid power: 1.80 GW; IT load: 1.44 GW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~864k
- Notes: 1.8 GW campus fed by 2.7 GW Tallgrass gas hub; Crusoe exited Jun 2026
- Last checked: 2026-11-21