# Schwarz Group Lübbenau

- Operator: Schwarz Digits
- Location: Lübbenau, Brandenburg, Germany (Europe)
- Coordinates (approx.): 51.87, 13.96
- Type: Telco / sovereign (AI-focused)
- Status: Under construction
- Reported capacity: 200 MW (grid / total power)
- Estimated grid power: 200 MW; IT load: 133 MW (PUE 1.50)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~80k
- Notes: €11B; up to 200 MW grid connection; ground broken Nov 2025, due end-2027
- Last checked: 2026-11-21

## Sources

- [JLL — Germany data centre market](https://www.jll.com/de-de/insights/die-neue-geografie-des-deutschen-rechenzentrumsmarktes)
- [Data Center Map — STACKIT Lübbenau](https://www.datacentermap.com/germany/lubbenau/stackit-lubbenau/)

Canonical page: https://atlas.kehai.co/f/schwarz-group-lubbenau/ · Dataset: https://atlas.kehai.co/data.json