# SK–AWS Ulsan AI DC

- Operator: SK Group · AWS
- Location: Ulsan, South Korea (Asia Pacific)
- Coordinates (approx.): 35.54, 129.31
- Type: AI campus (AI-focused)
- Status: Under construction
- Reported capacity: 1,000 MW (grid / total power)
- Estimated grid power: 1.00 GW; IT load: 800 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~480k
- Notes: 103 MW first phase (~60k GPUs) from 2027; target raised to 1 GW (Nov 2025)
- Last checked: 2026-11-21

## Sources

- [DCD — SK Telecom tenfold Ulsan expansion](https://www.datacenterdynamics.com/en/news/sk-telecom-plans-tenfold-expansion-for-data-center-in-ulsan-south-korea-plans-to-build-facility-in-vietnam/)
- [Korea Times — Groundbreaking](https://www.koreatimes.co.kr/business/tech-science/20250829/sk-aws-break-ground-for-ai-data-center-in-ulsan)

Canonical page: https://atlas.kehai.co/f/skaws-ulsan-ai-dc/ · Dataset: https://atlas.kehai.co/data.json
