# SoftBank Hokkaido Tomakomai AI DC

- Operator: SoftBank Corp.
- Location: Tomakomai, Hokkaido, Japan (Asia Pacific)
- Coordinates (approx.): 42.64, 141.6
- Type: AI campus (AI-focused)
- Status: Under construction
- Reported capacity: 300 MW (grid / total power)
- Estimated grid power: 300 MW; IT load: 240 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~144k
- Notes: 50 MW at FY2026 opening; >300 MW, potential 1 GW
- Last checked: 2026-11-21

## Sources

- [SoftBank — Next-gen infrastructure](https://cdn.softbank.jp/en/corp/sustainability/materiality/next-gen-infra/)
- [SoftBank — Inside the Tomakomai AI data center](https://www.softbank.jp/en/sbnews/entry/20260225_01)

Canonical page: https://atlas.kehai.co/f/softbank-hokkaido-tomakomai-ai-dc/ · Dataset: https://atlas.kehai.co/data.json