# SoftBank Sakai AI DC

- Operator: SoftBank Corp.
- Location: Sakai, Osaka, Japan (Asia Pacific)
- Coordinates (approx.): 34.56, 135.45
- Type: AI campus (AI-focused)
- Status: Under construction
- Reported capacity: 140 MW (grid / total power)
- Estimated grid power: 140 MW; IT load: 112 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~67k
- Notes: 140 MW AI DC from FY2027 on former Sharp plant; aiming >240 MW
- Last checked: 2026-11-21

## Sources

- [SoftBank — Next-gen infrastructure](https://cdn.softbank.jp/en/corp/sustainability/materiality/next-gen-infra/)
- [TechCrunch — SoftBank buys Sharp plant](https://techcrunch.com/?p=2980525)

Canonical page: https://atlas.kehai.co/f/softbank-sakai-ai-dc/ · Dataset: https://atlas.kehai.co/data.json
