# Stargate Argentina (Sur Energy)

- Operator: OpenAI · Sur Energy
- Location: Patagonia, Argentina (Latin America)
- Coordinates (approx.): -41.13, -71.31
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 500 MW (grid / total power)
- Estimated grid power: 500 MW; IT load: 400 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~240k
- Notes: LOI Oct 2025; up to 500 MW, ~US$25B; first 100 MW phase targeted 2027
- Last checked: 2026-11-21

## Sources

- [Converge Digest — Stargate Argentina](https://convergedigest.com/?p=106144)
- [AI Weekly / Reuters — Patagonia AI data centers](https://aiweekly.co/alerts/hyperscalers-court-argentine-patagonia-for-ai-data-centers)