# Switch Citadel Campus

- Operator: Switch
- Location: Tahoe Reno, NV, United States (North America)
- Coordinates (approx.): 39.55, -119.45
- Type: Colocation
- Status: Operating
- Reported capacity: 650 MW (grid / total power)
- Estimated grid power: 650 MW; IT load: 464 MW (PUE 1.40)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~279k
- Notes: 7.2M sq ft; build-out up to 850 MW
- Last checked: 2026-11-21

## Sources

- [Blackridge Research — Biggest data centers in the world](https://www.blackridgeresearch.com/blog/top-biggest-data-centers-in-the-world-location-capacity)

Canonical page: https://atlas.kehai.co/f/switch-citadel-campus/ · Dataset: https://atlas.kehai.co/data.json
