# TeraWulf Justified campus (Anthropic lease)

- Operator: TeraWulf · Anthropic
- Location: Hawesville, KY, United States (North America)
- Coordinates (approx.): 37.9, -86.75
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 401 MW (IT / critical load)
- Estimated grid power: 501 MW; IT load: 401 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~241k
- Notes: Justified Data Campus: ~401 MW critical IT leased to Anthropic for 20 years (~$19B); up to ~480 MW gross; first delivery 2H 2027
- Last checked: 2026-11-21

## Sources

- [DCD — Anthropic $19bn Kentucky lease with TeraWulf](https://www.datacenterdynamics.com/en/company/infhra/)
- [TeraWulf — Justified (Hawesville, KY)](https://terawulf.com/lake-mariner-mining)
- [TeraWulf — Q3 2026 results](https://capital.com/en-ae/news/terawulf-reports-third-quarter-2026-results)

Canonical page: https://atlas.kehai.co/f/terawulf-justified-campus-anthropic-lease/ · Dataset: https://atlas.kehai.co/data.json