# UAE–US AI Campus (remainder)

- Operator: G42 / Khazna
- Location: Abu Dhabi, United Arab Emirates (Middle East & Africa)
- Coordinates (approx.): 24.4, 54.7
- Type: AI campus (AI-focused)
- Status: Planned
- Reported capacity: 4,000 MW (grid / total power)
- Estimated grid power: 4.00 GW; IT load: 3.20 GW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~1.92M
- Notes: 5 GW campus excluding the 1 GW Stargate cluster
- Last checked: 2026-11-21