# YTL Green Data Center Park

- Operator: YTL · NVIDIA
- Location: Kulai, Johor, Malaysia (Asia Pacific)
- Coordinates (approx.): 1.66, 103.6
- Type: AI campus (AI-focused)
- Status: Operating
- Reported capacity: 1,200 MW (grid / total power)
- Estimated grid power: 1.20 GW; IT load: 960 MW (PUE 1.25)
- Blackwell-equivalent GPUs (GB200 NVL72 basis): ~576k
- Live IT load today (estimate): 100 MW
- Notes: NVIDIA GB200 cluster live Oct 2025; park plan doubled from 600 MW to 1.2 GW (Jun 2026)
- Last checked: 2026-11-21

## Sources

- [NST — Kulai campus doubles to 1.2 GW (Jun 2026)](https://www.nst.com.my/amp/business/corporate/2026/06/1472220/ytl-power-speeds-data-centre-expansion-kulai-campus-doubles-12gw)
- [Epoch AI — YTL Johor](https://epoch.ai/data/ai-data-centers/directory/ytl-johor)

Canonical page: https://atlas.kehai.co/f/ytl-green-data-center-park/ · Dataset: https://atlas.kehai.co/data.json