# DC Atlas > Sourced, weekly-updated index of 343 data centers and gigawatt-scale AI campuses in 39 countries: operator, location, status (operating / under construction / planned), reported capacity labelled as IT load or grid power, PUE-based conversions, Blackwell-GPU equivalents and independent estimates of IT power energised today. Data as of 2026-11-21. Capacity totals count disclosed figures only. Records with sources are marked verified; live IT estimates for the largest AI campuses mostly come from Epoch AI. Figures are estimates for orientation only. ## Data - [Full dataset (JSON)](https://atlas.kehai.co/data.json): one object per facility; field docs in the `schema` key - [Full dataset (CSV)](https://atlas.kehai.co/data.csv): flat table with derived grid/IT/GPU estimates and per-facility URLs - [All facilities as Markdown](https://atlas.kehai.co/llms-full.txt) - [Interactive map, cards, table and insights](https://atlas.kehai.co/) ## Countries - [United States](https://atlas.kehai.co/c/us/): 88 facilities, 55.0 GW disclosed grid power - [Japan](https://atlas.kehai.co/c/jp/): 30 facilities, 3.21 GW disclosed grid power - [India](https://atlas.kehai.co/c/in/): 18 facilities, 4.00 GW disclosed grid power - [United Kingdom](https://atlas.kehai.co/c/gb/): 16 facilities, 2.43 GW disclosed grid power - [South Korea](https://atlas.kehai.co/c/kr/): 15 facilities, 1.32 GW disclosed grid power - [China](https://atlas.kehai.co/c/cn/): 15 facilities, 0 MW disclosed grid power - [Germany](https://atlas.kehai.co/c/de/): 13 facilities, 1.36 GW disclosed grid power - [France](https://atlas.kehai.co/c/fr/): 12 facilities, 4.15 GW disclosed grid power - [Australia](https://atlas.kehai.co/c/au/): 12 facilities, 1.19 GW disclosed grid power - [Canada](https://atlas.kehai.co/c/ca/): 12 facilities, 7.68 GW disclosed grid power - [Singapore](https://atlas.kehai.co/c/sg/): 12 facilities, 237 MW disclosed grid power - [Malaysia](https://atlas.kehai.co/c/my/): 12 facilities, 2.49 GW disclosed grid power - [Ireland](https://atlas.kehai.co/c/ie/): 9 facilities, 0 MW disclosed grid power - [Netherlands](https://atlas.kehai.co/c/nl/): 7 facilities, 0 MW disclosed grid power - [Indonesia](https://atlas.kehai.co/c/id/): 7 facilities, 0 MW disclosed grid power - [Taiwan](https://atlas.kehai.co/c/tw/): 6 facilities, 100 MW disclosed grid power - [Sweden](https://atlas.kehai.co/c/se/): 5 facilities, 938 MW disclosed grid power - [Spain](https://atlas.kehai.co/c/es/): 5 facilities, 0 MW disclosed grid power - [Thailand](https://atlas.kehai.co/c/th/): 5 facilities, 0 MW disclosed grid power - [Finland](https://atlas.kehai.co/c/fi/): 4 facilities, 481 MW disclosed grid power - [Saudi Arabia](https://atlas.kehai.co/c/sa/): 4 facilities, 7.70 GW disclosed grid power - [Brazil](https://atlas.kehai.co/c/br/): 4 facilities, 4.75 GW disclosed grid power - [Norway](https://atlas.kehai.co/c/no/): 3 facilities, 288 MW disclosed grid power - [Italy](https://atlas.kehai.co/c/it/): 3 facilities, 0 MW disclosed grid power - [Mexico](https://atlas.kehai.co/c/mx/): 3 facilities, 0 MW disclosed grid power - [United Arab Emirates](https://atlas.kehai.co/c/ae/): 3 facilities, 5.25 GW disclosed grid power - [Vietnam](https://atlas.kehai.co/c/vn/): 3 facilities, 0 MW disclosed grid power - [Denmark](https://atlas.kehai.co/c/dk/): 2 facilities, 0 MW disclosed grid power - [Iceland](https://atlas.kehai.co/c/is/): 2 facilities, 0 MW disclosed grid power - [South Africa](https://atlas.kehai.co/c/za/): 2 facilities, 0 MW disclosed grid power - [Nigeria](https://atlas.kehai.co/c/ng/): 2 facilities, 0 MW disclosed grid power - [Hong Kong](https://atlas.kehai.co/c/hk/): 2 facilities, 0 MW disclosed grid power - [Chile](https://atlas.kehai.co/c/cl/): 1 facilities, 0 MW disclosed grid power - [Argentina](https://atlas.kehai.co/c/ar/): 1 facilities, 500 MW disclosed grid power - [Portugal](https://atlas.kehai.co/c/pt/): 1 facilities, 1.68 GW disclosed grid power - [Qatar](https://atlas.kehai.co/c/qa/): 1 facilities, 0 MW disclosed grid power - [Kenya](https://atlas.kehai.co/c/ke/): 1 facilities, 0 MW disclosed grid power - [Philippines](https://atlas.kehai.co/c/ph/): 1 facilities, 0 MW disclosed grid power - [New Zealand](https://atlas.kehai.co/c/nz/): 1 facilities, 0 MW disclosed grid power ## Largest facilities by disclosed power - [Fermi America Project Matador](https://atlas.kehai.co/f/fermi-america-project-matador/): Fermi America — Amarillo, TX, United States — planned, ai campus, 11.0 GW grid / 8.80 GW IT. $300B private-grid concept; initial 1 GW phase targeted first - [Wonder Valley AI campus](https://atlas.kehai.co/f/wonder-valley-ai-campus/): O'Leary Digital — Greenview, AB, Canada — planned, ai campus, 7.50 GW grid / 6.00 GW IT. Part of O'Leary Digital's 15 GW plan across Alberta and Utah; long-dated - [Humain East Riyadh AI campus](https://atlas.kehai.co/f/humain-east-riyadh-ai-campus/): Humain (PIF) — East Riyadh, Saudi Arabia — planned, ai campus, 6.00 GW grid / 4.80 GW IT. 6 GW hyperscale AI campus; tender May 2026 - [Scala AI City](https://atlas.kehai.co/f/scala-ai-city/): Scala Data Centers — Eldorado do Sul, RS, Brazil — planned, ai campus, 4.75 GW grid / 3.80 GW IT. Phased; first phase ~54 MW - [Homer City Energy Campus](https://atlas.kehai.co/f/homer-city-energy-campus/): Homer City Redevelopment · AWS (proposed) — Homer City, PA, United States — under construction, ai campus, 4.40 GW grid / 3.52 GW IT. Former coal plant; ~4.4 GW gas generation, power from 2027 - [UAE–US AI Campus (remainder)](https://atlas.kehai.co/f/uaeus-ai-campus-remainder/): G42 / Khazna — Abu Dhabi, United Arab Emirates — planned, ai campus, 4.00 GW grid / 3.20 GW IT. 5 GW campus excluding the 1 GW Stargate cluster - [Microsoft Fairwater Wisconsin](https://atlas.kehai.co/f/microsoft-fairwater-wisconsin/): Microsoft — Mount Pleasant, WI, United States — operating, hyperscaler, 2.72 GW grid / 2.26 GW IT, ~369 MW IT live. Epoch est. 369 MW IT live, 2,263 MW IT projected (Q2 2028); likely OpenAI training - [Stargate Doña Ana County](https://atlas.kehai.co/f/stargate-dona-ana-county/): OpenAI · Oracle — Doña Ana County, NM, United States — under construction, ai campus, 2.20 GW grid / 1.76 GW IT. On-site gas; projected completion Q4 2028 - [AWS Project Rainier New Carlisle](https://atlas.kehai.co/f/aws-project-rainier-new-carlisle/): Amazon (AWS) — New Carlisle, IN, United States — operating, hyperscaler, 2.20 GW grid / 1.83 GW IT, ~1.04 GW IT live. Largest tracked AI DC: Epoch est. ~1,037 MW IT live (Nov 2026), ~1.9 GW IT by 2028; Trainium2 for Anthropic - [Meta Hyperion](https://atlas.kehai.co/f/meta-hyperion/): Meta — Richland Parish, LA, United States — under construction, hyperscaler, 2.00 GW grid / 1.67 GW IT. 2 GW by 2030, scaling to 5 GW; on-site gas plants - [IREN Sweetwater](https://atlas.kehai.co/f/iren-sweetwater/): IREN — Sweetwater, TX, United States — under construction, ai campus, 2.00 GW grid / 1.60 GW IT. 2 GW campus; flagship for NVIDIA DSX AI factory design - [Poolside Project Horizon](https://atlas.kehai.co/f/poolside-project-horizon/): Poolside · CoreWeave — West Texas, United States — planned, ai campus, 2.00 GW grid / 1.60 GW IT. 2 GW behind-the-meter gas campus - [Project Jade (Cheyenne)](https://atlas.kehai.co/f/project-jade-cheyenne/): Black Hills Energy · Tallgrass · undisclosed tenant — Laramie County, WY, United States — planned, ai campus, 1.80 GW grid / 1.44 GW IT. 1.8 GW campus fed by 2.7 GW Tallgrass gas hub; Crusoe exited Jun 2026 - [Start Campus Sines](https://atlas.kehai.co/f/start-campus-sines/): Start Campus — Sines, Portugal — operating, colocation, 1.68 GW grid / 1.20 GW IT. SIN01 (26 MW) live since Q4 2024; six buildings, 1.2 GW IT secured - [IREN Oklahoma](https://atlas.kehai.co/f/iren-oklahoma/): IREN — Alva, OK, United States — planned, ai campus, 1.60 GW grid / 1.28 GW IT. 2,000 acres - [DataVolt Oxagon](https://atlas.kehai.co/f/datavolt-oxagon/): DataVolt — Oxagon, NEOM, Saudi Arabia — under construction, ai campus, 1.50 GW grid / 1.20 GW IT. 1.5 GW campus; 360 MW first phase under construction since Aug 2026 (100 MW with Humain), due 2028 - [Stargate Shackelford County (Vantage Frontier)](https://atlas.kehai.co/f/stargate-shackelford-county-vantage-frontier/): OpenAI · Oracle · Vantage — Shackelford County, TX, United States — under construction, ai campus, 1.40 GW grid / 1.12 GW IT. Vantage Frontier campus, 1,200 acres; first building H2 2026 - [Stargate Saline Township](https://atlas.kehai.co/f/stargate-saline-township/): OpenAI · Oracle · Related Digital — Saline Township, MI, United States — under construction, ai campus, 1.40 GW grid / 1.12 GW IT. Grid-powered; projected Q4 2028 - [Campus IA Fouju](https://atlas.kehai.co/f/campus-ia-fouju/): MGX · Bpifrance · Mistral · NVIDIA — Fouju, Seine-et-Marne, France — planned, ai campus, 1.40 GW grid / 1.12 GW IT. Construction from H2 2026, operations 2028 - [Stargate Port Washington (Vantage Lighthouse)](https://atlas.kehai.co/f/stargate-port-washington-vantage-lighthouse/): OpenAI · Oracle · Vantage — Port Washington, WI, United States — under construction, ai campus, 1.30 GW grid / 1.04 GW IT. Grid-powered; construction began Q1 2026 - [Stargate UAE](https://atlas.kehai.co/f/stargate-uae/): G42 / Khazna · OpenAI · Oracle — Abu Dhabi, United Arab Emirates — under construction, ai campus, 1.25 GW grid / 1.00 GW IT. First 200 MW due 2026; within 5 GW UAE–US AI Campus - [Stargate Abilene (Crusoe / Oracle)](https://atlas.kehai.co/f/stargate-abilene-crusoe-oracle/): OpenAI · Oracle · Crusoe — Abilene, TX, United States — operating, ai campus, 1.20 GW grid / 960 MW IT, ~824 MW IT live. Flagship Stargate campus; Epoch est. ~824 MW IT live (Nov 2026), 1.2 GW grid planned - [Stargate Milam County (SB Energy)](https://atlas.kehai.co/f/stargate-milam-county-sb-energy/): OpenAI · SoftBank — Milam County, TX, United States — under construction, ai campus, 1.20 GW grid / 960 MW IT. SoftBank-owned hardware; projected Q4 2028 - [AWS Madison County](https://atlas.kehai.co/f/aws-madison-county/): Amazon (AWS) — Canton, MS, United States — operating, hyperscaler, 1.20 GW grid / 1.00 GW IT. Project Rainier site; >350 MW IT today, ramping past 1 GW - [CloudBurst Central Texas](https://atlas.kehai.co/f/cloudburst-central-texas/): CloudBurst Data Centers — San Marcos, TX, United States — under construction, ai campus, 1.20 GW grid / 960 MW IT. Three 400 MW phases - [YTL Green Data Center Park](https://atlas.kehai.co/f/ytl-green-data-center-park/): YTL · NVIDIA — Kulai, Johor, Malaysia — operating, ai campus, 1.20 GW grid / 960 MW IT, ~100 MW IT live. NVIDIA GB200 cluster live Oct 2025; park plan doubled from 600 MW to 1.2 GW (Jun 2026) - [Colossus 2](https://atlas.kehai.co/f/colossus-2/): SpaceXAI (xAI) — Memphis, TN / Southaven, MS, United States — operating, ai campus, 1.18 GW grid / 946 MW IT, ~946 MW IT live. ~946 MW IT per S-1-based estimate; expansion toward ~2 GW - [Meta Prometheus](https://atlas.kehai.co/f/meta-prometheus/): Meta — New Albany, OH, United States — operating, hyperscaler, 1.00 GW grid / 833 MW IT, ~471 MW IT live. 1 GW 'titan' cluster; Epoch est. 471 MW IT live, ~1,022 MW IT projected - [Meta El Paso](https://atlas.kehai.co/f/meta-el-paso/): Meta — El Paso, TX, United States — under construction, hyperscaler, 1.00 GW grid / 833 MW IT. 1 GW AI campus - [Meta Lebanon](https://atlas.kehai.co/f/meta-lebanon/): Meta — Lebanon, IN, United States — under construction, hyperscaler, 1.00 GW grid / 833 MW IT. Meta's second Indiana campus, >$10B - [SoftBank / Sesterce Bosquel](https://atlas.kehai.co/f/softbank-sesterce-bosquel/): SoftBank · Sesterce — Bosquel, Somme, France — planned, ai campus, 1.00 GW grid / 800 MW IT - [Elsham Tech Park](https://atlas.kehai.co/f/elsham-tech-park/): Elsham Tech Park Ltd — Elsham, Lincolnshire, United Kingdom — planned, ai campus, 1.00 GW grid / 800 MW IT. 1 GW; planning submitted 2025, construction from 2027 - [Brookfield Cambrai AI campus](https://atlas.kehai.co/f/brookfield-cambrai-ai-campus/): Brookfield · Data4 — Cambrai, France — planned, ai campus, 1.00 GW grid / 800 MW IT - [Goodman Tsukuba (TY005)](https://atlas.kehai.co/f/goodman-tsukuba-ty005/): Goodman Group — Tsukuba, Ibaraki, Japan — under construction, colocation, 1.00 GW grid / 714 MW IT. Up to 1 GW at full build-out - [SK–AWS Ulsan AI DC](https://atlas.kehai.co/f/skaws-ulsan-ai-dc/): SK Group · AWS — Ulsan, South Korea — under construction, ai campus, 1.00 GW grid / 800 MW IT. 103 MW first phase (~60k GPUs) from 2027; target raised to 1 GW (Nov 2025) - [Google Visakhapatnam AI hub](https://atlas.kehai.co/f/google-visakhapatnam-ai-hub/): Google · AdaniConneX · Airtel — Visakhapatnam, AP, India — under construction, hyperscaler, 1.00 GW grid / 833 MW IT. $15B 2026–30; ground broken Apr 2026 - [Reliance Jamnagar AI campus](https://atlas.kehai.co/f/reliance-jamnagar-ai-campus/): Reliance Industries — Jamnagar, Gujarat, India — under construction, ai campus, 1.00 GW grid / 800 MW IT. Gigawatt-scale AI campus; Meta 168 MW pact (Jun 2026) - [Reliance / Brookfield / Digital Realty Vizag](https://atlas.kehai.co/f/reliance-brookfield-digital-realty-vizag/): Digital Connexion — Visakhapatnam, AP, India — planned, colocation, 1.00 GW grid / 714 MW IT. $11B, 400 acres - [AWS Susquehanna (Cumulus)](https://atlas.kehai.co/f/aws-susquehanna-cumulus/): Amazon (AWS) — Salem Township, PA, United States — operating, hyperscaler, 960 MW grid / 800 MW IT. Nuclear-adjacent campus bought from Talen - [Brookfield Strängnäs AI campus](https://atlas.kehai.co/f/brookfield-strangnas-ai-campus/): Brookfield — Strängnäs, Sweden — planned, ai campus, 938 MW grid / 750 MW IT. ~$10B; 750 MW IT; 10–15 year build ## Optional - [Sitemap](https://atlas.kehai.co/sitemap.xml)