Akita AI data center
(consortium)
Planned · AI campus · AI-focused
Grid power500 MW
IT load400 MW
Blackwell-equiv.240k
Reported figure: 500 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇯🇵 Akita, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | 300–500 MW concept, ~$12.6B est. |
| Last checked | 2026-11-21 |