Applied Digital Polaris Forge 2
Applied Digital
Under construction · AI campus · AI-focused
Grid power350 MW
IT load280 MW
Blackwell-equiv.168k
Reported figure: 280 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Harwood, ND, United States |
|---|---|
| Region | North America |
| Notes | 280 MW campus; 200 MW leased to a hyperscaler, ROFR on 800 MW more; PUE 1.18 target |
| Last checked | 2026-11-21 |