Brookfield Strängnäs AI campus
Brookfield
Planned · AI campus · AI-focused
Grid power938 MW
IT load750 MW
Blackwell-equiv.450k
Reported figure: 750 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇸🇪 Strängnäs, Sweden |
|---|---|
| Region | Europe |
| Notes | ~$10B; 750 MW IT; 10–15 year build |
| Last checked | 2026-11-21 |
Sources
Nearby in Sweden
| Facility | Location | Grid power |
|---|---|---|
| Microsoft Sweden Central | Gävle / Sandviken | — |
| EcoDataCenter Falun | Falun | — |
| Mistral / EcoDataCenter Borlänge | Borlänge | — |
| Meta Luleå | Luleå | — |