EdgeConneX Greater Osaka–Kyoto
EdgeConneX · Kagoya
Planned · Colocation
Grid power280 MW
IT load200 MW
Blackwell-equiv.120k
Reported figure: 200 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇯🇵 Greater Osaka, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | 200+ MW at full build |
| Last checked | 2026-11-21 |