DC AtlasOpen the interactive map →
DC Atlas / United States

Homer City Energy Campus

Homer City Redevelopment · AWS (proposed)
Under construction · AI campus · AI-focused
Grid power4.40 GW
IT load3.52 GW
Blackwell-equiv.2.11M

Reported figure: 4,400 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Homer City, PA, United States
RegionNorth America
NotesFormer coal plant; ~4.4 GW gas generation, power from 2027
Last checked2026-11-21
See it on the map →

Sources

Data Center Frontier — From coal to computehttps://www.datacenterfrontier.com/energy/article/55404954/from-coal-to-compute-how-pennsylvania-is-rebuilding-power-for-ai-data-centers

Nearby in United States

FacilityLocationGrid power
Stargate LordstownLordstown, OH—
Vantage Ashburn campusAshburn, VA—
Oracle Ashburn regionAshburn, VA—
Equinix Ashburn DC campusAshburn, VA—
Digital Realty Digital DullesSterling, VA—
AWS Northern Virginia clusterLoudoun / Prince William, VA—