KDDI Osaka Sakai AI DC
KDDI
Operating · AI campus · AI-focused
Grid power48 MW
IT load38 MW
Blackwell-equiv.23k
Reported figure: 48 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇯🇵 Sakai, Osaka, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | Opened Jan 22, 2026; GB200 NVL72, direct liquid cooling |
| Last checked | 2026-11-21 |
Sources
KDDI — Osaka Sakai DC openshttps://newsroom.kddi.com/english/news/detail/kddi_nr-916_4323.htmlMingtiandi — KDDI 48 MW Osaka AI DChttps://www.mingtiandi.com/real-estate/data-centres/japans-kddi-launches-service-at-48mw-osaka-ai-data-centre/
Nearby in Japan
| Facility | Location | Grid power |
|---|---|---|
| SoftBank Sakai AI DC | Sakai, Osaka | 140 MW |
| Vantage Osaka | Osaka | — |
| CyrusOne / KEPCO Osaka | Osaka | — |
| Equinix Osaka campus | Osaka | — |
| Equinix Osaka OS3 | Osaka | — |
| Microsoft Japan West | Osaka | — |