Microsoft Fairwater Wisconsin
Microsoft
Operating · Hyperscaler · AI-focused
Grid power2.72 GW
IT load2.26 GW
Live IT today (est.)369 MW
Blackwell-equiv.1.36M
Reported figure: 2,263 MW as IT / critical load. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Mount Pleasant, WI, United States |
|---|---|
| Region | North America |
| Notes | Epoch est. 369 MW IT live, 2,263 MW IT projected (Q2 2028); likely OpenAI training |
| Last checked | 2026-11-21 |
Sources
Epoch AI — Microsoft Fairwater Wisconsinhttps://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsinMicrosoft — Inside the world's most powerful AI datacenterhttps://blogs.microsoft.com/?p=52562570
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Stargate Port Washington (Vantage Lighthouse) | Port Washington, WI | 1.30 GW |
| QTS Chicago | Chicago, IL | — |
| Digital Realty 350 E Cermak | Chicago, IL | — |
| CyrusOne Aurora | Aurora, IL | — |
| AWS Project Rainier New Carlisle | New Carlisle, IN | 2.20 GW |
| Meta Lebanon | Lebanon, IN | 1.00 GW |