Operating · Hyperscaler · AI-focused
Grid power324 MW
IT load270 MW
Blackwell-equiv.162k
Reported figure: 270 MW as IT / critical load. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇰🇷 Sejong, South Korea |
|---|---|
| Region | Asia Pacific |
| Notes | 270 MW at full build; NVIDIA expansion 100 MW by 2027, 200 MW by 2028 |
| Last checked | 2026-11-21 |
Sources
Nearby in South Korea
| Facility | Location | Grid power |
|---|---|---|
| Samsung SDS Dongtan | Hwaseong | — |
| Kakao Ansan | Ansan | — |
| LG U+ Pyeongchon | Anyang | — |
| AWS Seoul region | Seoul metro | — |
| SK Broadband Gasan | Seoul | — |