Nebius Independence campus
Nebius
Planned · AI campus · AI-focused
Grid power800 MW
IT load640 MW
Blackwell-equiv.384k
Reported figure: 800 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Independence, MO, United States |
|---|---|
| Region | North America |
| Notes | Announced Jan 2026: 400-acre site, 800 MW planned (up to 1.2 GW) |
| Last checked | 2026-11-21 |