Nebius Mäntsälä
Nebius
Operating · AI campus · AI-focused
Grid power94 MW
IT load75 MW
Blackwell-equiv.45k
Reported figure: 75 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇫🇮 Mäntsälä, Finland |
|---|---|
| Region | Europe |
| Notes | Expanded to 75 MW (2026); heat reuse into district heating |
| Last checked | 2026-11-21 |