NEXTDC S4 Horsley Park
NEXTDC
Planned · Colocation · AI-focused
Grid power420 MW
IT load300 MW
Blackwell-equiv.180k
Reported figure: 300 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇦🇺 Sydney, Australia |
|---|---|
| Region | Asia Pacific |
| Notes | 300 MW target IT |
| Last checked | 2026-11-21 |