NTT Tokyo TKY12
NTT DATA
Planned ยท Colocation
Grid power280 MW
IT load200 MW
Blackwell-equiv.120k
Reported figure: 200 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | ๐ฏ๐ต Inzai-Shiroi, Chiba, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | ~200 MW announced |
| Last checked | 2026-11-21 |
Sources
Nearby in Japan
| Facility | Location | Grid power |
|---|---|---|
| MC Digital Realty NRT campus | Inzai, Chiba | 146 MW |
| Google Inzai | Inzai, Chiba | โ |
| NTT Tokyo Inzai campus | Inzai, Chiba | โ |
| Colt DCS Inzai | Inzai, Chiba | 70 MW |
| AirTrunk TOK1 | Inzai, Chiba | 420 MW |
| Princeton Digital TY1 | Inzai, Chiba | โ |