DC AtlasOpen the interactive map โ†’
DC Atlas / Japan

NTT Tokyo TKY12

NTT DATA
Planned ยท Colocation
Grid power280 MW
IT load200 MW
Blackwell-equiv.120k

Reported figure: 200 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location๐Ÿ‡ฏ๐Ÿ‡ต Inzai-Shiroi, Chiba, Japan
RegionAsia Pacific
Notes~200 MW announced
Last checked2026-11-21
See it on the map โ†’

Sources

DCD โ€” NTT plans 200 MW campus outside Tokyo (Apr 2026)https://www.datacenterdynamics.com/en/tags/chiba/

Nearby in Japan

FacilityLocationGrid power
MC Digital Realty NRT campusInzai, Chiba146 MW
Google InzaiInzai, Chibaโ€”
NTT Tokyo Inzai campusInzai, Chibaโ€”
Colt DCS InzaiInzai, Chiba70 MW
AirTrunk TOK1Inzai, Chiba420 MW
Princeton Digital TY1Inzai, Chibaโ€”