Reliance / Brookfield / Digital Realty Vizag
Digital Connexion
Planned · Colocation · AI-focused
Grid power1.00 GW
IT load714 MW
Blackwell-equiv.429k
Reported figure: 1,000 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇮🇳 Visakhapatnam, AP, India |
|---|---|
| Region | Asia Pacific |
| Notes | $11B, 400 acres |
| Last checked | 2026-11-21 |
Sources
Nearby in India
| Facility | Location | Grid power |
|---|---|---|
| Google Visakhapatnam AI hub | Visakhapatnam, AP | 1.00 GW |
| AWS Hyderabad region | Hyderabad | — |
| Microsoft Hyderabad | Hyderabad | — |
| CtrlS Hyderabad campus | Hyderabad | 500 MW |
| Nxtra Chennai | Chennai | — |
| Yotta NM1 | Panvel, Navi Mumbai | — |