Scala AI City
Scala Data Centers
Planned · AI campus · AI-focused
Grid power4.75 GW
IT load3.80 GW
Blackwell-equiv.2.28M
Reported figure: 4,750 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇧🇷 Eldorado do Sul, RS, Brazil |
|---|---|
| Region | Latin America |
| Notes | Phased; first phase ~54 MW |
| Last checked | 2026-11-21 |
Sources
Compiled from public reporting; not yet individually verified.
Nearby in Brazil
| Facility | Location | Grid power |
|---|---|---|
| Equinix São Paulo SP campus | São Paulo, SP | — |
| Ascenty Campinas | Campinas, SP | — |
| TikTok Pecém data center | Caucaia, CE | — |