STACK Stafford Technology Campus
STACK Infrastructure
Under construction Β· Colocation
Grid power1.10 GW
IT load786 MW
Blackwell-equiv.471k
Reported figure: 1,100 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | πΊπΈ Stafford, VA, United States |
|---|---|
| Region | North America |
| Notes | 500 acres, four sub-campuses, six 300 MW Dominion substations; first building topped out |
| Last checked | 2026-11-21 |