Start Campus Sines
Start Campus
Operating · Colocation · AI-focused
Grid power1.68 GW
IT load1.20 GW
Blackwell-equiv.720k
Reported figure: 1,200 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇵🇹 Sines, Portugal |
|---|---|
| Region | Europe |
| Notes | SIN01 (26 MW) live since Q4 2024; six buildings, 1.2 GW IT secured |
| Last checked | 2026-11-21 |
Sources
DCD — Start Campus SIN01, 26 MWhttps://www.datacenterdynamics.com/en/news/start-campus-and-schneider-electric-partner-to-deliver-26mw-data-center-in-sines-portugal/Lightwave — 1.2 GW IT securedhttps://www.lightwaveonline.com/data-center/article/55132459/start-campus-secures-data-center-power-boost
Nearby in Portugal
| Facility | Location | Grid power |
|---|