Switch Core Campus
Switch
Operating Β· Colocation
Grid power495 MW
IT load354 MW
Blackwell-equiv.212k
Reported figure: 495 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | πΊπΈ Las Vegas, NV, United States |
|---|---|
| Region | North America |
| Notes | 2.34M sq ft today, growing to 3.94M sq ft and 495 MW |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| CoreSite One Wilshire (LA1) | Los Angeles, CA | β |
| Tract Buckeye | Buckeye, AZ | β |
| Microsoft Goodyear / El Mirage | Goodyear, AZ | β |
| Iron Mountain Phoenix | Phoenix, AZ | β |
| Aligned Phoenix | Phoenix, AZ | β |
| Meta Eagle Mountain | Eagle Mountain, UT | β |