DC AtlasOpen the interactive map →
DC Atlas / United Arab Emirates

UAE–US AI Campus (remainder)

G42 / Khazna
Planned · AI campus · AI-focused
Grid power4.00 GW
IT load3.20 GW
Blackwell-equiv.1.92M

Reported figure: 4,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇦🇪 Abu Dhabi, United Arab Emirates
RegionMiddle East & Africa
Notes5 GW campus excluding the 1 GW Stargate cluster
Last checked2026-11-21
See it on the map →

Sources

Gulf News — Stargate UAE within 5 GW campushttps://gulfnews.com/business/markets/stargate-uae-first-phase-of-200mw-to-complete-by-2026-1.500310364

Nearby in United Arab Emirates

FacilityLocationGrid power
Stargate UAEAbu Dhabi1.25 GW
Khazna AjmanAjman—